Laserfiche WebLink
TABLE OF CONTENTS <br />Responsive Ŷ Resourceful Ŷ Reliable <br />1.0 SOIL SUITABILITY STUDY ............................................................................................. 3 <br />1.1 Introduction and Development ............................................................................. 3 <br />1.1.1 Site Description ........................................................................................ 4 <br />1.1.2 Proposed Development ............................................................................ 5 <br />1.1.3 Site Vicinity ............................................................................................... 5 <br />1.1.4 Site Map ................................................................................................... 6 <br />1.2 Present and Past Uses of the Site ....................................................................... 6 <br />1.2.1 Past and Present Site Use........................................................................ 6 <br />1.3 Existing and Proposed Septic Tank Usage .......................................................... 6 <br />1.3.1 Existing On-Site Septic Tank Usage ......................................................... 6 <br />1.3.2 Site Specific Permit History ...................................................................... 7 <br />1.3.3 Discussion of On-Site Septic Tank Installation and Repair ....................... 8 <br />1.3.4 Existing Septic Tank Usage in the Vicinity ................................................ 8 <br />1.3.5 Septic Permit History in the Vicinity .......................................................... 8 <br />1.3.6 Septic Repair Permit History in the Vicinity ............................................... 9 <br />1.3.7 Expected On-Site Maximum Septic Tank Usage ...................................... 9 <br />1.4 Groundwater Information ................................................................................... 11 <br />1.4.1 Groundwater Depth and Gradient ........................................................... 11 <br />1.4.2 Potential Groundwater Contamination Issues ......................................... 11 <br />1.4.3 Water Sample Location .......................................................................... 12 <br />1.4.4 Groundwater Sample Analysis ............................................................... 12 <br />1.4.5 Groundwater Sample Handling ............................................................... 1 2 <br />1.5 Soil Profile and Geologic Information ................................................................. 13 <br />1.5.1 Soil Boring Locations .............................................................................. 13 <br />1.5.2 Soil Boring Dimensions .......................................................................... 13 <br />1.5.3 Soil Lithology Observed .......................................................................... 13 <br />1.5.4 Discussion of Soil Lithology .................................................................... 14 <br />1.6 Percolation Test Information .............................................................................. 14 <br />1.6.1 Percolation Test Locations ..................................................................... 14 <br />1.6.2 Number of Percolation Tests .................................................................. 14 <br />1.6.3 Boring Preparation and Presaturation ..................................................... 14 <br />1.6.4 Condition of Borings after Presaturation ................................................. 14 <br />1.6.5 Percolation Test Procedure .................................................................... 14 <br />1.6.6 Percolation Test Forms and Results ....................................................... 15 <br />1.6.7 Discussion of Percolation Test Results ................................................... 15 <br />1.6.8 Discussion of Septic System Sizing ........................................................ 15 <br />2.0 NITRATE LOADING STUDY ......................................................................................... 16 <br />2.1 Chemical and Physical Properties of Soil ........................................................... 16 <br />2.1.1 Chemical and Physical Soil Properties ................................................... 16 <br />2.1.2 Mass Transport Soil Properties .............................................................. 17 <br />2.2 Groundwater Analysis ........................................................................................ 17 <br />2.2.1 Regional Groundwater............................................................................ 17 <br />2.2.2 Potential Ground Water Contamination Issues ....................................... 17 <br />2.2.3 Current and Future On-Site Ground Water Uses .................................... 17 <br />2.3 Sources and Impact of Nitrate to Groundwater .................................................. 18 <br />2.3.1 Current Off-Site Sources of Nitrate ......................................................... 18 <br />2.3.2 Contribution of Rainfall ........................................................................... 18 <br />2.3.3 Current On-Site Sources of Nitrate ......................................................... 18 <br />2.3.4 Future On-Site Sources of Nitrate........................................................... 18