Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MIRACLE MILE MARKET as of March 09, 2021. <br /> Open violations from August 25, 2020 inspection <br /> Violation#107-Failure to submit and maintain complete and current financial responsibility documents. <br /> OBSERVATION: Financial responsibility documents have not been submitted to the EHD. The most recent <br /> financial responsibility documents in CERS are dated 12/18/2017. <br /> REGULATION GUIDANCE: Current financial responsibility documents are required to be submitted annually. <br /> CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System(CERS)at <br /> http://cers.calepa.ca.gov/, and upload the required documents. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#115-Failure to submit"Monitoring System Certification Form"within 30 days of completion of <br /> the test. <br /> OBSERVATION:A monitoring system certification and leak detector testing were performed on 08/25/2020. A test <br /> report has not been submitted to the EHD or the California Environmental Reporting System(CERS). <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the test. <br /> CORRECTIVE ACTION: Immediately provide this report to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#116-Failure to submit the"Spill Container Testing Report Form"within 30 days after the test. <br /> OBSERVATION: Spill container testing were performed on 08/25/2020. A test report has not been submitted to the <br /> EHD or the California Environmental Reporting System(CERS). <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the test. <br /> CORRECTIVE ACTION: Immediately provide this report to the EHD. <br /> Page 1 of 4 <br />