Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MIRACLE MILE MARKET as of October 06 , 2021 . <br /> Open violations from August 02 , 2021 inspection <br /> ❑ This violation was corrected This violation will be corrected by (date) : AlO /D' / <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION : An inspection was last done on 8/25/2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance . This information was required to be submitted by <br /> 1 / 10/2021 . This information was received late and incomplete on 3/16/2021 resulting in a non-compliant status for <br /> this facility. <br /> REGULATION GUIDANCE : An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> CORRECTIVE ACTION : Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> F This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> RECEIVE® <br /> OCT 212021 <br /> ENVIRONMENTAL <br /> HEALTH DEPARTMENT <br /> Page 2 of 2 <br />