Laserfiche WebLink
The results will be recorded and reported quarterly to the <br />California Integrated Waste Management Board and the Local <br />Enforcement Agency. Monitoring will begin in late March and will <br />continue quarterly. The County will be installing a permanent <br />landfill gas monitoring system for closure consisting of <br />multilevel gas wells. This system will replace the 21 borings <br />once it is installed. <br />