My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1993 - 1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_1993 - 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:23:18 PM
Creation date
3/24/2021 11:16:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1993 - 1996
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HENRY M. HIRATA <br />DIRECTOR <br />March 15, 1995 <br />• <br />0 <br />COUNTY OF SAN JOAQU I N <br />EUGENE DELUCCHI <br />DEPARTMENT OF PUBLIC WORKS <br />CHIEF DEPUTY DIRECTOR <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />THOMAS R. FLINN <br />STOCKTON. CALIFORNIA 95201 <br />DEPUTY DIRECTOR <br />(209) 468-3000 <br />MANUEL LOPEZ <br />FAX(209)468-2999 <br />DEPUTY DIRECTOR <br />Arnie Inouye <br />California Regional Water <br />Quality Control Board <br />Central Valley Region <br />3443 Routier Road <br />Sacramento, California 95827 <br />Subject: CONSTRUCTION OF TEST PAD AT THE <br />CORRAL HOLLOW SANITARY LANDFILL <br />Dear Mr. Inouye: <br />The Corral Hollow Sanitary Landfill is due to stop accepting <br />waste by May 1995, and closure activities will begin soon <br />thereafter. The County is planning to construct the closure test <br />pad on March 27, 1995. The clay barrier layer will be <br />constructed in one 12 -inch lift, similar to the closure of the <br />Harney Lane Sanitary Landfill. Soil (including clay) for the <br />test pad will be imported from Granite Construction's nearby <br />gravel pits. The soil will be mixed and moisture conditioned by <br />Griffin Soil (the same contractor as Harney Lane) and compacted <br />by County personnel. <br />Soil mixing will begin at approximately 9:00 a.m. on <br />Please try to attend or have a representative attend <br />the construction. If you have any questions, please <br />(209) 468-3066. <br />Sincerely, <br />�'h-L <br />GABRIEL KARAM, P.E. <br />Senior Solid Waste Engineer <br />GK:WJ: vj <br />R:JVIRGINIAJLETTERSJCH-PAD.AI <br />c: Scott Walker, California Integrated <br />Waste Management Board <br />Ed Padilla, Public Health Services <br />Environmental Health Division <br />LA 21846F <br />March 27. <br />to observe <br />call me at <br />
The URL can be used to link to this page
Your browser does not support the video tag.