Laserfiche WebLink
STATE OF CALIFORNIA }>`,F Pete Wilson,Governor <br /> CALIFORNIA INTEGRATED WASTE MANAGEMENT BO <br /> 8800 Cal Center Drive 4 s <br /> Sacramento,California 95826 <br /> fig_ t <br /> March 24, 1995 <br /> Mr. Gabriel Karam, P.E. <br /> Senior Solid Waste Engineer <br /> County of San Joaquin Department of Public Works <br /> Stockton, CA 95201 <br /> RE: Review of the Final Closure and Postclosure Maintenance <br /> Plans, Corral Hollow Sanitary Landfill, San Joaquin County, <br /> Facility No. 39-AA-0005 <br /> Dear Mr. Karam: <br /> On February 16, 1995 the California Integrated Waste Management <br /> (Board) received Revision #3 of the final closure and postclosure <br /> maintenance materials for the above facility. These materials <br /> included: <br /> A. Corral Hollow Sanitary Landfill Final Closure Plan - <br /> Revision #3 , February 1995 . <br /> B. Corral Hollow Sanitary Landfill Final Postclosure <br /> Maintenance Plan Revision #3, February 1995 . <br /> C. Work Plan For Landfill Gas Monitoring Corral Hollow Sanitary <br /> Landfill, San Joaquin County, November 3, 1994 <br /> Board staff have reviewed the noted Plans. Based on the review <br /> of the Plans, Board staff are prepared to recommend to our Deputy <br /> Director that the Final Closure and Postclosure Maintenance Plans <br /> for the Corral Hollow Sanitary Landfill Site be approved upon <br /> meeting the following requirements : <br /> 1 . Provide documentation which demonstrates that a sufficient <br /> quantity of barrier layer cover material has been stockpiled <br /> to complete the closure construction within the time frame <br /> of the submitted construction schedule. <br /> 2 . ,Final Approval letter from the Regional Water Quality <br /> Control Board. <br /> Printed on Recycled Paper-Double Sided for Source Reduction-- <br />