Laserfiche WebLink
7. Sheet 3 of the engineered drawing indicates that the spacing between Gw1- <br />Gw2, Gw2-Gw3, and Gw3-Gw4 exceed 1000 feet. This is not in compliance <br />with 14CCR 17783.5 (b) (1). <br />8. Include in the construction quality assurance plan that a final documentation <br />report will be compiled and submitted to CIWMB and LEA at the completion of <br />the project (14CCR 17774(3)(4)). <br />9. The cost for drainage system installation indicated on page 20 differs from that <br />of page 22 of the final closure plan (page 20 shows $9,000 and page 22 show <br />$30,800). <br />10. Postclosure Maintenance Plan - Any future plans for reduction of landfill gas <br />monitoring frequency during the postclosure maintenance period shall be <br />approved by CIWMB and the LEA. <br />Should you have any questions regarding these comments, please call Raju IT'Jathew, <br />Senior Registered Environmental Health Specialist at 468-3459. <br />6p'.O� -40 JKL <br />Laurie Cotulla, Program Manager <br />Environmental Health Division <br />410fig <br />