Laserfiche WebLink
Ernest, Frederick [ EHD ] <br /> From : Erica Rodriguez < erodriguez@wpinc.com > <br /> Sent : Wednesday, September 29, 2021 10: 38 PM <br /> To : Ernest, Frederick [ EHD] ; Rivera, Stacy [ EHD] <br /> Cc : EH - UST; ' Steven .J .Jones@shell .com '; Jake Prowse; Ryan Hultner; <br /> theresa . geijer@shell .com <br /> Subject : Piping Closure in Place Application and Information- 3515 Navy Drive ., Stockton CA j <br /> Attachments : site mitigation well boring permit 9 .29 .21 . pdf, Updated Permit for Piping Closure in <br /> Place . pdf; Piping Sampling Plan jpg; IMG-5857 .JPG; IMG-5861 .JPG <br /> CAUTION : This email is originated from outside of the organization . Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe . <br /> Ms. Rivera and Mr. Ernest, <br /> Attached please find a revised permit text to close the piping in place at the above mentioned location based on verbal <br /> discussion to Steven J . Jones and Ryan Hultner while onsite. <br /> The primary reasons for the closure in place are 1) the proximity to other in-use equipment which is a safety hazard. 2) <br /> Location of the piping run within the containment area for the loading racks, compromise in this area could result in a j <br /> safety concern. <br /> It was requested that WPI Construction answer the following questions: <br /> 1) Means and method to slurry the pipe in place <br /> a. How will you pour the slurry in the pipe? WPI will install a 4" Bell by Male fitting to the fiberglass <br /> fitting in the sump then an adapter to reduce the size to 2" , then a camlock fitting to allow the cement <br /> pump to connect directly. WPI will pump slurry from the cut nearer the loading rack towards the <br /> UST. We will see the slurry come into the UST with a visual inspection. Once slurry is visible from <br /> inside the UST sump the line will be capped at the fuel line sump. Fill the remainder of the UST <br /> sump. And verify both the piping and UST are properly closed in place. <br /> b. The pipe is currently open ended on both sides. How will you determine that the slurry is coming out on <br /> both ends? Visual inspection will be completed, we will be able to see each side. <br /> 2) Soil boring plan <br /> a. The requirement is (1) soil boring per 20' of pipe. There is 84' of pipe from the rack to the UST. Draft <br /> Boring permit application is attached, it still requires a signature from the driller, Gregg and we expect <br /> this Thursday 9/30. 4 borings are proposed. <br /> If you have any questions please reach out and I will be happy to address. Thank you . <br /> Erica J. Rodriguez, PMP <br /> Senior Scientist Wayne Perry, Inc. <br /> Consulting - Construction - Engineering - Maintenance <br /> 8281 Commonwealth Ave. I Buena Park CA, 90621 <br /> 0: 714 . 826 . 0352 1 F: 714 .523 . 7880 1 C : 714. 267.5147 <br /> erodriguez@wpinc. com www.wpinc. com <br /> 1 <br />