Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMP/UDC TEST (continued) <br />Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br />Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID <br />UDC 9&10 <br />UDC 11&12 <br />Sump Manufacturer <br />Bravo <br />Bravo <br />Sump Depth (inches) <br />10" <br />10" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />BP <br />BP <br />Test Start Time <br />9:47 <br />9:52 <br />Initial Reading <br />.001 <br />.001 <br />Test End Time <br />10:17 <br />10:22 <br />Final Reading <br />.001 <br />.001 <br />Change in Reading <br />0 <br />0 <br />Pass /Fail Criteria <br />> .002 <br />> .002 <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Tightness Test Results <br />M Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 4 of 5 <br />