My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2200 - Hazardous Waste Program
>
PR0231084
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 2:38:19 PM
Creation date
3/29/2021 2:36:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231084
PE
2361
FACILITY_ID
FA0006447
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
01
SITE_LOCATION
2320 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Page 4 of 6 <br />7. LINE LEAK DETECTOR TESTING <br /> Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br />Simulated release rate verified: (Check all that apply.) <br /> 3 GPH 0.1 GPH 0.2 GPH Yes No NA <br />Has the testing apparatus been properly calibrated? <br />For emergency generator tank systems, does the LLD create an audible and visual <br />alarm when a leak is detected? <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br />release is detected? <br />For electronic LLDs, does the turbine automatically shut off when a release is <br />detected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a tightness test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected <br />for kinks and breaks? <br /> <br />Were all LLDs confirmed operational within regulatory requirements? <br />LLD ID LLD Model Lines Monitored Pass Fail <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9
The URL can be used to link to this page
Your browser does not support the video tag.