My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6475
>
2900 - Site Mitigation Program
>
PR0537637
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 8:58:52 AM
Creation date
3/31/2021 1:01:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0537637
PE
2960
FACILITY_ID
FA0021678
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
6475
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
02
SITE_LOCATION
6475 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultants <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION....................................................................................................................1 <br /> 1.1 Work Plan Objectives......................................................................................................1 <br /> 1.2 Document Organization ..................................................................................................1 <br /> 2. VAPOR INTRUSION CONCEPTUAL SITE MODEL..........................................................2 <br /> 2.1 Historical Site Use and Sources ......................................................................................2 <br /> 2.2 Vadose Zone Stratigraphy...............................................................................................2 <br /> 2.3 Previous Investigations................................................................................................ 2 <br /> 2.4 Remedial Action, Optimization and Confirmation Sampling.........................................3 <br /> 2.5 Recent Investigation.......................................................................................................4 <br /> 2.6 Potential Data Gaps........................................................................................................4 <br /> 3. SITE INVESTIGATION OBJECTIVES .................................................................................5 <br /> 4. SCOPE OF WORK...................................................................................................................6 <br /> 4.1 Rationale and Approach..................................................................................................6 <br /> 4.2 Pre-Field Activities..........................................................................................................7 <br /> 4.2.1 Health and Safety Plan Addendum .....................................................................7 <br /> 4.2.2 Permitting and Access.........................................................................................7 <br /> 4.2.3 Utility Survey......................................................................................................7 <br /> 4.3 Soil Vapor Probe Installation and Sampling...................................................................8 <br /> 4.3.1 Drilling and Geologic Logging...........................................................................8 <br /> 4.3.2 Soil Vapor Probe Installation and Sampling.......................................................8 <br /> 4.3.3 Site Restoration and Waste Management............................................................8 <br /> 5. REPORTING AND SCHEDULE ............................................................................................9 <br /> 6. REFERENCES.......................................................................................................................10 <br /> 202012 Lincoln Center Soil Vapor Assessment Work Plan ii December 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.