Geosyntec <br /> consultants <br /> 5. REPORTING AND SCHEDULE <br /> Pending CVRWQCB approval of the above scope of work, field implementation of soil vapor <br /> probe installation and sampling can commence within two weeks. Soil vapor probe installation <br /> and sampling is anticipated to be completed within one week. Results from the investigation will <br /> be summarized in a memorandum within four weeks of validation of all analytical data. The <br /> memorandum will summarize the findings from the investigation and propose next steps as <br /> warranted. <br /> 202012 Lincoln Center Soil Vapor Assessment Work Plan 9 December 2020 <br />