My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6475
>
2900 - Site Mitigation Program
>
PR0537637
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 8:58:52 AM
Creation date
3/31/2021 1:01:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0537637
PE
2960
FACILITY_ID
FA0021678
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
6475
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
02
SITE_LOCATION
6475 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosynte& <br /> consultants <br /> ❑ APPLICABLE ® NOT APPLICABLE <br /> The task(s) for this project involve confined-space entry. Workers must abide by the company's <br /> Confined Space Entry Program (Procedure HS 118). <br /> 18. GLOBALLY-HARMONIZED SYSTEM FOR HAZARD COMMUNICATION <br /> ® APPLICABLE ❑ NOT APPLICABLE <br /> The following procedures must be followed for chemicals brought onto the site by Geosyntec <br /> personnel or by subcontractors (i.e., decontamination solution, sampling preservatives, KB-1® <br /> solution, sodium permanganate, etc.) while performing the tasks of this project: <br /> • Labels on primary chemical containers must not be defaced; <br /> • Chemicals must be stored in appropriate storage containers; <br /> • Secondary containers and storage cabinets must be correctly and clearly labeled; <br /> • Chemicals incompatible with each other must not be stored together; <br /> • Workers must receive training on the chemical hazards; and <br /> • Safety Data Sheets (SDSs) must be added to Appendix F. <br /> When chemicals are used on-site, workers must abide by Geosyntec's GHS Hazard <br /> Communication Program (Procedure HS 115). <br /> 19. HASP AMENDMENTS <br /> Over the course of this project, it is possible that the project-specific hazards and working <br /> conditions will change. This HASP may be reviewed and amended as necessary to effectively <br /> describe the changing working conditions and measures to mitigate the potential health and <br /> safety issues that may arise during the project. Amendments to the HASP should be briefly <br /> described in the following spaces provided. The full text of the amendments should be provided <br /> in <br /> SAC III HASP—Revision—October 2020 20 10/22/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.