Laserfiche WebLink
DRILLING ❑Follow safe work practices,as applicable: <br /> Hazards:Struck-by,run-over,caught Non-essential personnel to stay clear of drilling work zone when drill rig in operation. <br /> between(pinch points), manual . Equipment inspected daily upon mobilization;maintained in good repair,backup alarms. <br /> lifting,roll over,fluid leaks,fuel Leaks or defective safety equipment should be repaired before use. <br /> hazards,suspended equipment Establish eye contact with operator and use hand signals prior to approaching near equipment. <br /> . PPE used near operating rig(eye/head/hearing/hand/foot protection,high visibility vests or equivalent). <br /> • Contractor inspects drill rig daily before use,verify daily that emergency stop is functional. <br /> • Drill rig to be equipped with operational emergency stop,equipment in good repair,machine guards in <br /> place,whip checks on high pressure lines. <br /> . Park personal/support vehicles in a location as to not obstruct travel lanes or other site operations. <br /> • Operators/helpers maintain safe distance from moving parts;secure loose hair,loose clothing,equipment. <br /> • Drill rigs will only be moved with masts lowered. <br /> • Max.safe slope for rig will be followed,drill rig leveled,appropriate blocking/cribbing as needed. <br /> • Use safety practices for refueling,fuel handling/storage/transport. <br /> • Spill equipment is available for fuel and hydraulic fluid leaks. <br /> • Verify mechanical lift/rigging equipment(cables,sheaves,boom,attachments)is in proper working order. <br /> . Ventilate and conduct air monitoring,as appropriate,when drilling indoors. <br /> Geosyntec Procedure(s):HS-403-Drilling,Others as applicable <br /> ❑ IMPORTANT! This work may/will ❑Follow safe work practices per Section B.9.,"Utility Related Hazards' <br /> include close proximity to overhead <br /> electric utility lines. <br /> B.7. CONSTRUCTION, HEAVY EQUIPMENT,LIFT EQUIPMENT ®Applicable ❑ Not Applicable,Not Anticipated <br /> EXPLANATORY NOTES,CLARIFICATIONS: <br /> ® HEAVY EQUIPMENT ❑Follow general safe work practices for heavy equipment: <br /> Hazards:Struck-by,run-over,caught . Trained/qualified persons operate all heavy equipment. <br /> between(pinch points),roll over, . Do not get into a potential crush situation below or between equipment,or in an excavation. <br /> fluid leaks,overhead hazards . No passengers on moving/operating equipment except where passenger seat/restraint is present. <br /> • Equipment inspected daily upon mobilization;maintained in good repair,backup alarms. <br /> . Leaks or defective safety equipment should be repaired before use. <br /> • Operators required to use seatbelts. <br /> . Maintain eye contact with operator and use hand signals prior to approaching near equipment. <br /> • High visibility vests for all personnel in construction vehicle work area,on-site roadways and travel lanes. <br /> • Maximum safe slope for each vehicle will be followed. <br /> . Personnel to stay clear of,or restrict access to,swing radius and travel path of equipment. <br /> • Spill equipment available for fuel and hydraulic fluid leaks. <br /> . Equipment locked,secured,brakes set,buckets/forks lowered,when not in use. <br /> • Park personal/support vehicles in a location as to not obstruct travel lanes or other site operations. <br /> . Mark temporary roadways clearly,provide berms/stop logs where needed. <br /> Geosyntec Procedure(s):HS-504-Heavy Equipment,HS-132-Competent Persons <br /> CRANES ❑In addition to general safety practices for heavy equipment(above),as applicable: <br /> Hazards: • Only qualified persons operate cranes(certificate required). <br /> - electrocution by overhead utility . Critical Lift Plan&Checklist prepared/executed(HS 506)prior to mobilization. <br /> - injury in swing radius . Equipment to be inspected prior to mobilization and daily by crane operator. <br /> - injury from falling load . Crane operator will remain at the controls at all times during operation. <br /> - crane tipping over due to . Crane operation must be performed under the direction of an appointed signal person at all times. <br /> overbalancing,high winds, <br /> unstable ground,unsafe slope, • Communication between crane operator and signal person will be maintained through standard hand <br /> bad placement of outriggers signals or voice communication equipment. <br /> -injury from mechanical hazards • Keep area beneath suspended loads clear of personnel. <br /> . Rigging procedures-see Mechanical Lifting,Rigging,below. <br /> Geosyntec Procedure(s):HS-506-Cranes,HS-132-Competent Persons <br /> ❑ MECHANICAL LIFTING,RIGGING ❑In addition to general safety practices for heavy equipment and cranes(above),as applicable: <br /> Applies to lifting by crane,truck- • Coordinate lifting operations with competent person. <br /> mounted boom rig(e.g.drill rig), • Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart. <br /> mechanical/electrical hoist,similar . Slings,chains,rope,wire rope and related equipment used for lifting shall be maintained in good condition, <br /> equipment. and used in a manner as to protect from damage. <br /> Hazards:falling loads,personnel . Rigging,wire rope and hoisting equipment will be inspected and maintained on a weekly basis. <br /> undersuspendedloads. <br /> • Hooks will be equipped with safety latches. <br /> . Ensure anchor points for winch or other lift device(such as davit arm)are engineered for intended use. <br /> Geosyntec Procedure(s):HS-506-Cranes <br /> ❑ FORKLIFT ❑In addition to general safety practices for heavy equipment(above),as applicable: <br /> • Qualified operator,per established forklift training(certificate is required). <br /> Geosyntec° THA(-r.2)-Task 1 -Driving October 22,2020 <br /> Lincoln Center-SAC1111 Page 6 <br /> Cn11SUkantS <br />