DRILLING ❑Follow safe work practices,as applicable:
<br /> Hazards:Struck-by,run-over,caught Non-essential personnel to stay clear of drilling work zone when drill rig in operation.
<br /> between(pinch points), manual . Equipment inspected daily upon mobilization;maintained in good repair,backup alarms.
<br /> lifting,roll over,fluid leaks,fuel Leaks or defective safety equipment should be repaired before use.
<br /> hazards,suspended equipment Establish eye contact with operator and use hand signals prior to approaching near equipment.
<br /> . PPE used near operating rig(eye/head/hearing/hand/foot protection,high visibility vests or equivalent).
<br /> • Contractor inspects drill rig daily before use,verify daily that emergency stop is functional.
<br /> • Drill rig to be equipped with operational emergency stop,equipment in good repair,machine guards in
<br /> place,whip checks on high pressure lines.
<br /> . Park personal/support vehicles in a location as to not obstruct travel lanes or other site operations.
<br /> • Operators/helpers maintain safe distance from moving parts;secure loose hair,loose clothing,equipment.
<br /> • Drill rigs will only be moved with masts lowered.
<br /> • Max.safe slope for rig will be followed,drill rig leveled,appropriate blocking/cribbing as needed.
<br /> • Use safety practices for refueling,fuel handling/storage/transport.
<br /> • Spill equipment is available for fuel and hydraulic fluid leaks.
<br /> • Verify mechanical lift/rigging equipment(cables,sheaves,boom,attachments)is in proper working order.
<br /> . Ventilate and conduct air monitoring,as appropriate,when drilling indoors.
<br /> Geosyntec Procedure(s):HS-403-Drilling,Others as applicable
<br /> ❑ IMPORTANT! This work may/will ❑Follow safe work practices per Section B.9.,"Utility Related Hazards'
<br /> include close proximity to overhead
<br /> electric utility lines.
<br /> B.7. CONSTRUCTION, HEAVY EQUIPMENT,LIFT EQUIPMENT ®Applicable ❑ Not Applicable,Not Anticipated
<br /> EXPLANATORY NOTES,CLARIFICATIONS:
<br /> ® HEAVY EQUIPMENT ❑Follow general safe work practices for heavy equipment:
<br /> Hazards:Struck-by,run-over,caught . Trained/qualified persons operate all heavy equipment.
<br /> between(pinch points),roll over, . Do not get into a potential crush situation below or between equipment,or in an excavation.
<br /> fluid leaks,overhead hazards . No passengers on moving/operating equipment except where passenger seat/restraint is present.
<br /> • Equipment inspected daily upon mobilization;maintained in good repair,backup alarms.
<br /> . Leaks or defective safety equipment should be repaired before use.
<br /> • Operators required to use seatbelts.
<br /> . Maintain eye contact with operator and use hand signals prior to approaching near equipment.
<br /> • High visibility vests for all personnel in construction vehicle work area,on-site roadways and travel lanes.
<br /> • Maximum safe slope for each vehicle will be followed.
<br /> . Personnel to stay clear of,or restrict access to,swing radius and travel path of equipment.
<br /> • Spill equipment available for fuel and hydraulic fluid leaks.
<br /> . Equipment locked,secured,brakes set,buckets/forks lowered,when not in use.
<br /> • Park personal/support vehicles in a location as to not obstruct travel lanes or other site operations.
<br /> . Mark temporary roadways clearly,provide berms/stop logs where needed.
<br /> Geosyntec Procedure(s):HS-504-Heavy Equipment,HS-132-Competent Persons
<br /> CRANES ❑In addition to general safety practices for heavy equipment(above),as applicable:
<br /> Hazards: • Only qualified persons operate cranes(certificate required).
<br /> - electrocution by overhead utility . Critical Lift Plan&Checklist prepared/executed(HS 506)prior to mobilization.
<br /> - injury in swing radius . Equipment to be inspected prior to mobilization and daily by crane operator.
<br /> - injury from falling load . Crane operator will remain at the controls at all times during operation.
<br /> - crane tipping over due to . Crane operation must be performed under the direction of an appointed signal person at all times.
<br /> overbalancing,high winds,
<br /> unstable ground,unsafe slope, • Communication between crane operator and signal person will be maintained through standard hand
<br /> bad placement of outriggers signals or voice communication equipment.
<br /> -injury from mechanical hazards • Keep area beneath suspended loads clear of personnel.
<br /> . Rigging procedures-see Mechanical Lifting,Rigging,below.
<br /> Geosyntec Procedure(s):HS-506-Cranes,HS-132-Competent Persons
<br /> ❑ MECHANICAL LIFTING,RIGGING ❑In addition to general safety practices for heavy equipment and cranes(above),as applicable:
<br /> Applies to lifting by crane,truck- • Coordinate lifting operations with competent person.
<br /> mounted boom rig(e.g.drill rig), • Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart.
<br /> mechanical/electrical hoist,similar . Slings,chains,rope,wire rope and related equipment used for lifting shall be maintained in good condition,
<br /> equipment. and used in a manner as to protect from damage.
<br /> Hazards:falling loads,personnel . Rigging,wire rope and hoisting equipment will be inspected and maintained on a weekly basis.
<br /> undersuspendedloads.
<br /> • Hooks will be equipped with safety latches.
<br /> . Ensure anchor points for winch or other lift device(such as davit arm)are engineered for intended use.
<br /> Geosyntec Procedure(s):HS-506-Cranes
<br /> ❑ FORKLIFT ❑In addition to general safety practices for heavy equipment(above),as applicable:
<br /> • Qualified operator,per established forklift training(certificate is required).
<br /> Geosyntec° THA(-r.2)-Task 1 -Driving October 22,2020
<br /> Lincoln Center-SAC1111 Page 6