My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2022 4:20:09 PM
Creation date
3/31/2021 3:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GV GVLI FaGyc 1 _ <br /> i/28/2021 Ellie IV Contractors Mail - Flog City Chevron 8421 Capitol Ave Lodi Violabons <br /> m ii <br /> Michel Kennard <tech155@eliteiv. c01m> <br /> Flag City Chevron 6421 Capitol Ave Lodi Violations <br /> 1 message <br /> Michel Kennard <micheIkennard@eliteiv. com> ^ ~ � � Wed , May 26 , 2021 at 10048 AM <br /> To: Michel Kennard <tech155@eliteiv.com> <br /> Mr, quo <br /> In response to the violations you sent me I am giving you an update for your records and to respond to EHD as you <br /> requested . <br /> In response to violation 3050 Item 110. Failure to keep signed copy of manifest from the designated facility due to work <br /> order 4695 . The nozzle was not left on site in the HazMat drum . All VST nozzles are needed for core credit from the <br /> Manufacturer in order to be rebuilt. There Is a core credit of approximately $200. 00 . 1 checked our records and talked to <br /> the technician involved and confirmed no nozzle was left 1n the drum . It was a clerical error that should not have been on <br /> the paperwork. Talking to the technician Involved he said he was going to place the nozzle in the drum but then realized <br /> that he needed to return the nozzle to the manufacturer due to the core credit involved . He crossed off the statement from <br /> our copies of paperwork but not from the original issued to you at the time of the service call . <br /> In response to violation Item 302 . The 91 annular pull string broke during tesbng . Our technician was able to push the 91 <br /> sensor Into place while on site to do the survey for the 87 master spill container replacement . We will add a new string to <br /> the sensor when we are on site to install the new spill container. This requires 2 technicians In order to replace the pull <br /> string . <br /> in response to violation Item 318. The 87 main spill container failed when tested . We have a new spill container on order <br /> and will schedule the install and inspections with EHD as soon as we receive the new spill container. <br /> I hope this helps clarify things for you and EHD . if the inspector has any questions he is free to call me to discuss . <br /> Michel Kennard <br /> Service Manager EliteIV <br /> Mcblle# t 208 . 585-95' 8 Violation -# 110 , # 302 , # 318 <br /> 0" c" , 209 .4614337 <br /> Email : michalkennard@dlitsiv.com <br /> https://mall .google . com/maIYu/1 ? ik=c1b7418Q598&view=pt&search=all &permthid =thread -f% 3A1700844089033345901 & atmpl =megwr/a3A17008440890 . , . 1 /1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.