My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2022 4:20:09 PM
Creation date
3/31/2021 3:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I `- <br /> f�- Che. v/ten <br /> Appendix BB <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions . All length measurements are in inches . Please contact the Authority Having Jurisdic- <br /> tion (AHJ ) and review local , state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt . <br /> Take the following measurements with the valve in - <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body (see figures ) , upper tube length . <br /> Note : the Upper Tube Length must be at least 16" to in - <br /> clude the protective bend in the tube . <br /> ( D ) _ r / t ILIo <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube, valve length . <br /> (w) = 13/L� 137 ( D) <br /> ( U ) I J) Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank . Note : If a tank bottom protector is present it 4 <br /> may be necessary to add this thickness to dimension <br /> (OPW 611 I .&ZITP models add 0 .6 " ) it (W) Valve <br /> ( B) _ 3 � 136 I Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number (Y) which corresponds <br /> to the 100% volu1 e . ( B) <br /> (Y) _ <br /> To Tank <br /> (Y) <br /> 1 . To determine shut-off percentage : Tank <br /> Subtract upper tube length ( D ) from distance to tank ( U ) Valve Chart <br /> bottom ( B ) Length, 100% <br /> ( X ) = ( B ) — ( D ) - 2 " _ top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal - <br /> culated ( X) dimension and the 100% volume (Y ) tank <br /> capacity . j <br /> ( X) tank capacity in gallons <br /> (Y ) tank capacity in gallons <br /> SO % = (X ) capacity / (Y ) capacity x100 <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local , state, and national codes . If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced . For <br /> reference 40 CFR part 280 Subpart B Section 280 . 20 overfill <br /> valves should be set to a maximum of 95 %. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.