My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2022 4:20:09 PM
Creation date
3/31/2021 3:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 26 2x21 11-59AM HI' Fax page 1 <br /> Elite ry Conuactora Mad-Flog City Chevmn 6421 Capitol Ara Ludl Viotnllons <br /> mail Mlchaf Kennard -ctech155@a1iteiv,ealn} <br /> Flag City Chevron 6421 Capitol Ave Lodi Violations - — <br /> t message <br /> Michas Kennard<m1cha1kennrard@aliteiv.com5 - - --- - Wed,May 26. 2021 at 10:46 AM <br /> To: Mic lal Kennard-tech155@eliteiv.com> <br /> Mr, Que <br /> In response to the violations you sent me l am giving you an update for your records and to respond to E11D as you <br /> requested. <br /> In response to violation 3050 item 110.Failure to keep signed copy of manirest from the designated facility due to wofk <br /> order 4655_The nozzle was not left on site In the HazMat drum, All VST ironies are naaded For core credit from the <br /> Manufacturer in order to be rebuilt.There is a core credit of approximately 5200-00-1 checked our records and talked tU <br /> the technician involved and confirmed na nozzle was tett in the oaten.it was a clerical error that should not have bean nn <br /> the paperwork. Talking to the technician Jnvolved he said he was going to place the noaSe in the drum bun then realized <br /> that he needed to return the nozzle io the:manufacturer due to the core cxedit involved. he Grossed off the statement from <br /> our copies of paperwork but not from the originaJ issued to you at the time of the service call. <br /> In response to violation Itern 302. The 91 2r pular pull string broke during testing. Our tacihrician was able to push the 91 <br /> sonsar into place while on site to do the survey for the 87 master spill container replacement.We will add o new string to <br /> the sensor when we are on site to install the clew spill container.This requires 2 technicians in order to replace the pull <br /> string. <br /> In response to violation item 318.The 87 main spill container Milled when tested.We have a new spill container on order <br /> and will schedule the install and inspections with EHU as soon as we receive the new spill con lainer. <br /> hope this helps clarity things for you and IrHO-If the inspector has any questions he is free to call me to discuss- <br /> Mir-hail Kennard <br /> Service Manager Elite IV <br /> Mobilo#: 09.585-9579 <br /> Offlca#: 209461-6337 <br /> �rslail: micJialkenn�,fd@elfteiv.cvrrs <br /> hlipsJJmall.gcw9sa,cUnrlsnalUuli77t�474t8D59f;$vlmirP�Senr�h'�pll8lrorh4lh[d�tYraad-f'f.3A17Q09}MUt'IyQ333AS401�tsimpl�n�sg-t�3+�1r0UdlI�U8t7U <br />
The URL can be used to link to this page
Your browser does not support the video tag.