My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2022 4:20:09 PM
Creation date
3/31/2021 3:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lay Gb GUL1 11:59AM HH Fax page 1 <br /> 5!28/2021 Elite IV Contractors Mail-Flag City Chevron 6421 Capitol Ave Lodi Violations <br /> t. <br /> Gmail Michal Kennard <tech155C&e1lteiv.com> <br /> Flag City Chevron 6421 Capitol Ave Lodi Violations <br /> 1 message <br /> Mlchat Kennard<michalkennard@a elitelv.com> Wed, May 26, 2021 at 10:48 AM <br /> To: Michal Kennard <tech155@eliteiv.com> <br /> Mr,Quo <br /> In response to the violations you sent me 1 am giving you an update for your records and to respond to EHD as you <br /> requested. <br /> In response to violation 3050 Item 110. Failure to keep signed copy of manifest from the designated facility due to work <br /> order 4695.The nozzle was not left on site in the HazMat drum. All VST nozzles are needed for core credit from the <br /> Manufacturer in order to be rebuilt.There is a core credit of approximately$200.00. 1 checked our records and talked to <br /> the technician involved and confirmed no nozzle was left in the drum. It was a clerical error that should not have been on <br /> the paperwork. Talking to the technician Involved he said he was going to place the nozzle in the drum but then realized <br /> that he needed to return the nozzle to the manufacturer due to the core credit involved. He crossed off the statement from <br /> our copies of paperwork but not from the original issued to you at the time of the service call. <br /> In response to violation item 302. The 91 annular pull string broke during testing. Our technician was able to push the 91 <br /> sensor into place while on site to do the survey for the 87 master spill container replacement. We will add a new string to <br /> the sensor when we are on site to install the new spill container.This requires 2 technicians in order to replace the pull <br /> string. <br /> In response to violation item 318. The 87 main spill container failed when tested. We have a new spall container on order <br /> and will schedule the install and inspections with EHD as soon as we receive the new spill container. <br /> 1 hope this helps clarify things for you and EHD. If the inspector has any questions he is free to call me to discuss. <br /> Michal Kennard <br /> Service Manager Elite IV <br /> Mobile#: 209-585-9579 <br /> Offlce* 209-4.61-6337 <br /> Email: michalkennard@eliteiv.com <br /> https://mall.google.com/maiVull?ik=db74180598&vlew=pt&search=all&permthid=thread-f7*3Al7008440,BW33345901&slmpl=mag-i°/a3Al7O0844WOO.., 1/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.