My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2022 4:20:09 PM
Creation date
3/31/2021 3:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Environmental Reporting System: Business Kiumars Khajevandi's Account 51an Out JQgJ1a1 Reports ff Ul <br /> CERS usiness Home : <br /> UST Monitoring <br /> UST Tank M TA05055M <br /> A UST monitorkV plan must be completed for each tanMJST System entered into CERS. This form must be updated within 30 days of changes in the information it <br /> contains. Please note that your local agency may require you to obtain approval prior to installing or moddykV monitoring equipment- <br /> Select Edit to modify this monitoring plan. <br /> UST monitoring pians must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed. Provide this document using <br /> the UST Moniloring Site Plan supplemental documentation farad elsewhere in the UST submittal element <br /> Submitted for CERS ID 10180605 on 2/22/2021 12:37PM by Kiumars Khajgvandi of FLAG CIN CHEVRON (LOQI ,LA� <br /> Submittal was Accepted on 2x2=1 by Carol Presto for San Joaquin County Environmental Health <br /> Comments by regulator. This UST submittal was accepted by Carol Presto, EHST, ICC Certified UST Inspector, on 212212021 . This acceptance is <br /> subject to vetificaCron at the next scheduled field inspection. <br /> View -rank Information <br /> epy-Mot»toring--P49n-ittformetio <br /> This section would allow the user to copy Monitoring Plan information from another tank. This option would only appear if this fac ty had one or <br /> more existing tanks with Monitoring Plana. <br /> ' lity lnformation toring L-otations-- <br /> FLAG CITY CHEVRON Monitoring Equipment Serviced Site Plot Plan Submitted <br /> 6421 CAPITOL AVE Amy Site Plant Previously SuW&sd <br /> LODI , CA 95242 _ <br /> k=Monhor4ngis-Performed-4Jsing-ihe=Foltowing-Method <br /> Yes Continuous Electronic Tank Monitoring * <br /> Secondary Containment System Monitor Panel Manufacturer Leak Sensor Manufacturer <br /> Dry veeder root veeder root <br /> Monitor Panel Model Leak Sensor Model 0 <br /> tls350 409 <br /> No Automatic Tank Gorging lP <br /> [No Mor <br /> a 4) CERS Help Spttlnn � My Business : FLAG CITY CHEVRON 1111 Select Putt; <br /> NO Weekly Nianuai Tank Gauge � No Tank IntegNty Testing tb <br /> No Other Monitoring <br /> pe=Meniteringis+edormed Joing#hefoiiowin" <br /> Yea Continuous Monitoring of Piping Secondary Containment $ <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry veederroot veeder root <br /> Panel Model # Leak Sensor Model <br /> tis350 208 <br /> Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes <br /> Failure/Disconnect Triggers Pump Shutdown <br /> Yes <br /> Yes Mechanical Line Leak Detector Performs 3 GPH Leak Test ti <br /> j MLLD Manufacturer MLLD Model <br /> VMI 99 LD4000 <br /> No Electronic Line Leek Detector Performs 3 GPH Leak Test0 <br /> https ://cersbusiness . calepa .ca ,gov/49393/ Facility/ 10180605/ Submittal / UST/4713041 /MonitoringPlan/Detail /21383354 5/24/21 , 1 : 50 PM <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.