My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 11:20:13 AM
Creation date
4/1/2021 8:34:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
JACKSONS ENERGY #6822
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANI O III Environmental Health Department <br /> C © U N T YiJ-...__, <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that Is repaired or replaced . Ensure a copy of <br /> the "Site Health and Safety Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done . (ifda ding piping , UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST installation Application pages 4-8 as necessary for a timely plan review) : <br /> LQyv�' fti�ZS G ` C <br /> TI S&nws <br /> e N i + 95 a <br /> dltiQ,r 1t1�-►� . ! P <br /> Cold Start and monitoring cert <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Bravo Conversion frames <br /> Gilbarco Encore 700S dispensers <br /> 6. Decontamination procedures : <br /> a. Will piping be decontaminated prior to removal? YES [ ] NO [ ] <br /> b. Identify, contractor performing decontamination: <br /> Name Phone �) <br /> Address City Zip <br /> i <br /> I <br /> 3 of 6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.