My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
9015
>
2300 - Underground Storage Tank Program
>
PR0521738
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:52:27 PM
Creation date
4/1/2021 8:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0521738
PE
2371
FACILITY_ID
FA0014762
FACILITY_NAME
JD Service Station, Inc.
STREET_NUMBER
9015
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
9015 WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> ( Environmental Health Department <br /> C O U N TY - . _... _ <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed? YES [ j NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component, describe <br /> how this will be done . (If adding piping , UDC 's , or other UST equipment, or performing tank top upgrade , <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> Remove & Replace Existing 87 Tank Overspill Container <br /> Remove Existing Straight Drop Tubes on the 87/91 & Diesel Tanks & <br /> Install (3) New Overfill Drop Tubes <br /> Remove & Replace # 11 / 12 Shear Valve <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval) : <br /> ( 1 ) 85100 / PhikTite Overspill Container <br /> ( 3) 708591902 / EBW Defend erOverfill Drop Tubes <br /> ( 1 ) 10BHMP-5830 / OPW Shear Valve <br /> I <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal? YES ( ] NO ( j <br /> b . Identify contractor performing decontamination : <br /> Name Phone (_) <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.