My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15250
>
2300 - Underground Storage Tank Program
>
PR0537919
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2021 11:44:49 AM
Creation date
4/1/2021 9:18:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0537919
PE
2351
FACILITY_ID
FA0021886
FACILITY_NAME
Love's Travel Stop #538
STREET_NUMBER
15250
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Lodi
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
15250 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#: Love's County#538 538 Date:4/14/2020 <br /> Address: 15250 Thornton Rd Name:Clint Fuhrman �J <br /> City/State:Lodi CA <br /> Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building: 2 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 5 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram G r r <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS G. r <br /> 5 Do all E-Stops shutdown power to ALL STP's G r r <br /> 6 Are ALL E-Stops clearly Labeled r r r <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled G. r r <br /> POST TEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. G r r <br /> 9 All safety barricades and test equipment has been properly removed f•+ r r <br /> 10 E-Stop was reset and all dispensing functions are normal G r r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(Clearly describe any deficiencies found) <br /> WO:2345989 <br />
The URL can be used to link to this page
Your browser does not support the video tag.