Laserfiche WebLink
Underground Storage Tank <br /> `Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST (ANNULAR) <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: PEI/ RP1200/ 10Hg for 1 hr <br /> Tank ID DSL <br /> Tank Manufacturer Unknown <br /> Tank Capacity N/A <br /> Test Start Time 10:35 <br /> Initial Reading -10 <br /> Test End Time 11:35 <br /> Final Reading -10 <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results I ® Pass ❑ Fail I ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST (SEC LINE) <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: PEI/ RP1200/ 5 psi for 1 HR <br /> Pipe Run ID DSL 1 DSI- 2 <br /> Pipe Manufacturer Unknown Unknown <br /> Test Start Time 10:40 10:50 <br /> Initial Reading 5 5 <br /> Test End Time 11:40 11:50 <br /> Final Reading 5 5 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Page 2 of 6 <br />