My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 11:10:32 AM
Creation date
4/5/2021 1:49:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U derground Storage Tank <br /> Overfill Prevention Equipment InS ection Report Form <br /> 6. OVERFILL PREVENTION EQUIP ENT DETAILS <br /> Tank ID (One OPE per column) DSL 1 DSL 2 <br /> Large <br /> Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? ® No ® No ❑ No ❑ No <br /> OPE Model OPW OPW <br /> Tank Manufacturer Xerxes Xerxes <br /> ® Shuts off ® Shuts off ❑ Shuts off ❑ Shuts off <br /> Flow Flow Flow Flow <br /> What is the OPE response when ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> activated? Flow Flow Flow Flow <br /> (Check a#that apply.) ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual ❑Visual ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> piping that may interfere with the OPE ® No ® No ❑ No ❑ No <br /> operation? <br /> At what level in the tank is the OPE set to 81" 77„ <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank in over 95% 85% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition ® Yes ® Yes ❑ Yes ❑ Yes <br /> to respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ❑ Pass ® Pass ❑ Pass ❑ Pass <br /> ® Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> DSL 1 Large drop tube is over 95% per regulation. Will need to return, replace and retest. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.