My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
255
>
2300 - Underground Storage Tank Program
>
PR0537549
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 7:59:50 AM
Creation date
4/5/2021 1:54:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0537549
PE
2351
FACILITY_ID
FA0021617
FACILITY_NAME
HARNEY LANE AM PM
STREET_NUMBER
255
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
062-580-40
CURRENT_STATUS
01
SITE_LOCATION
255 E Harney Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 2 4 2021 <br />(Submit minimum of 3 sets of plans & applications as originals will be ret M ITWENTAL HEALTH <br />DEPARTMENT <br />1. Site map enclosed? YES NO [ ] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Remove (4) straight drop tubes. Install (4) drop tubes with flappers. Test with the county. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />(4) OPW drop tubes <br />EH230038 (revised 12-11-15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.