Laserfiche WebLink
S JCOG. Inc. <br />555 East Weller Avenue •Stockton, CA 95202 • (209) 235-0600 •FAX (209) 235-0438 <br />Sc«i Joaquin County Multi -Species Habitat COt2SE1"Uut Ult F� Open Space Plan (SJMSCP) <br />SJMSCP RESPONSE TO LOCAL JURISDICTION (RTLJ) <br />ADVISORY AGENCY NOTICE TO SJCOG, Inc. <br />To: Giuseppe Sanfilippo, San Joaquin County, Community Development Department <br />From: Laurel Boyd, SJCOG, Inc. <br />Date. April 7, 2021 <br />-Local Jurisdiction Project Title: PA -2000212 (SA) <br />Assessor Parcel Number(s): 087-054-09 <br />Local Jurisdiction Project Number: PA -2000212 (SA) <br />Total Acres to be converted from Open Space Use: Unknown <br />Habitat Types to be Disturbed: Multi -Purpose Open Space Habitat Land <br />Species Impact Findings: Findings to be determined by SJMSCP biologist. <br />Dear Mr. Sanfilippo: <br />SJCOG, Inc. has reviewed the project referral for PA -2000212 (SA). This project consists of a Site Approval application to <br />establish an unmanned, 10 megawatt (MW) battery energy storage system facility utilizing 0.4 acres of a 15 -acre parcel to <br />include 128 storage containers to house battery storage racks for lithium batteries with integrated fire suppression <br />systems. The project will connect to PG&E's transmission grid at the existing Ceres substation located to the north of the <br />site via a new 12.47 W generation interconnection transmission line (gen-tie) and will receive, store and discharge <br />electricity to and from the grid. There is an existing trailer and equipment storage yard that will remain on-site. The project <br />will not utilize water services. Storm drainage will be retained on-site. The project site is located on the south side of E. <br />Cherokee Rd., 830 feet east of N. Overhiser Rd., Stockton. (APN/Address: 087-054-09 / 5550 E. Cherokee Rd., <br />Stockton). <br />San Joaquin County is a signatory to San Joaquin County Multi -Species Habitat Conservation and Open Space Plan <br />(SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br />and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br />Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br />Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br />SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br />project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br />amount and kind equal to that provided in the SJMSCP. <br />This Project is subject to the SJMSCP. This can be up to a 30 day process and it is recommended that the project <br />applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br />information package. http://www,sjcog.orci <br />Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br />■ Schedule a SJMSCP Biologist to perform apre-construction survey prior to any ground disturbance <br />• SJMSCP Incidental take Minimization Measures and gation requirement: <br />1. Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the project applicant prior to any <br />ground disturbance but no later than six (6) months from receipt of the ITMMs. If ITMMs are not signed within six months, the applicant <br />must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This <br />is the effective date of the ITMMs. <br />2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br />3. Upon issuance of fiully executed ITMMs and prior to any ground disturbance, the project applicant must: <br />a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered (the bond <br />should be valid for no longer than a 6 month period); or <br />b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br />C, Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />