My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
3009
>
2600 - Land Use Program
>
PA-2100031
>
SU0014056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:36:37 AM
Creation date
4/7/2021 2:18:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014056
PE
2666
FACILITY_NAME
PA-2100031
STREET_NUMBER
3009
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912011, -13, -14
ENTERED_DATE
4/7/2021 12:00:00 AM
SITE_LOCATION
3009 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Map ID MAP FINDINGS <br /> Direction <br /> Distance EDR ID Number <br /> Elevation Site Database(s) EPA ID Number <br /> HUSKY CRANE INC (Continued) 1000273351 <br /> Provide records of testing or immediately perform integrity and leak <br /> testing of this piping and ensure that piping is tested when required, <br /> or provide equivalence as allowed by CFR 112.7(a)(2). <br /> Violation Division: San Joaquin County Environmental Health <br /> Violation Program: APSA <br /> Violation Source: CERS <br /> Site ID: 273240 <br /> Site Name: MAXIM CRANE WORKS <br /> Violation Date: 05-20-2019 <br /> Citation: HSC 6.67 25270.4.5(a)-California Health and Safety Code,Chapter <br /> 6.67,Section(s)25270.4.5(a) <br /> Violation Description: Failure to amend the SPCC Plan within 6 months: 1.When the facility <br /> has had a change in design,construction,operation,or maintenance <br /> which affects the facilityG s discharge potential.AND/OR 2.To <br /> include more effective proven technology at the time of the 5-year <br /> SPCC Plan review and evaluation. <br /> Violation Notes: Returned to compliance on 06/03/2020.The tanks described in the SPCC <br /> plan as the 165 gallon gear oil and 275 gallon transmission oil have <br /> been removed from the facility per facility personnel.The tank <br /> described as the 600 gallon hydraulic oil tank has been replaced with <br /> a 165 gallon tank and the 570 gallon engine oil tank has been replaced <br /> by a 400 gallon tank,per facility personnel.A tank holding more than <br /> 55 gallons of hydraulic oil for an oil filter crusher was observed in <br /> the main shop but was not mentioned in the SPCC plan.This tank may <br /> qualify as operational equipment.Amend the SPCC Plan for your <br /> facility in accordance with the general requirements in-112.7,and <br /> with any specific section of this part applicable to your facility, <br /> when there is a change in the facility design,construction, <br /> operation,or maintenance that materially affects its potential for a <br /> discharge as described in-112.1(b).Examples of changes that may <br /> require amendment of the Plan include,but are not limited to: <br /> commissioning or decommi <br /> Violation Division: San Joaquin County Environmental Health <br /> Violation Program: APSA <br /> Violation Source: CERS <br /> Site ID: 273240 <br /> Site Name: MAXIM CRANE WORKS <br /> Violation Date: 05-27-2016 <br /> Citation: HSC 6.67 25270.4.5(a)-California Health and Safety Code,Chapter <br /> 6.67,Section(s)25270.4.5(a) <br /> Violation Description: Failure to adequately describe the physical layout of the facility,or <br /> no description of the physical layout of the facility included within <br /> the SPCC plan. <br /> Violation Notes: Returned to compliance on 05/21/2019.The facility map did not include <br /> the accurate locations of all aboveground tanks at this facility and <br /> did not include any petroleum storage inside the shop.The Spill <br /> Prevention,Control,and Countermeasure(SPCC)Plan shall include a <br /> facility diagram which must mark the location and contents of each <br /> fixed storage container and the storage area where mobile or portable <br /> containers are located.It must identify the location of and mark as <br /> "exempt"underground tanks. It must also include all transfer stations <br /> and connecting pipes,including intra-facility gathering lines. <br /> Immediately update the facility diagram to include all of the required <br /> information.Submit a legible copy of the updated facility diagram to <br /> the EHD for review. <br /> TC6327721.2s Page 343 <br />
The URL can be used to link to this page
Your browser does not support the video tag.