My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
3009
>
2600 - Land Use Program
>
PA-2100031
>
SU0014056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:36:37 AM
Creation date
4/7/2021 2:18:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014056
PE
2666
FACILITY_NAME
PA-2100031
STREET_NUMBER
3009
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912011, -13, -14
ENTERED_DATE
4/7/2021 12:00:00 AM
SITE_LOCATION
3009 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Map ID MAP FINDINGS <br /> Direction <br /> Distance EDR ID Number <br /> Elevation Site Database(s) EPA ID Number <br /> HUSKY CRANE INC (Continued) 1000273351 <br /> Site ID: 273240 <br /> Site Name: MAXIM CRANE WORKS <br /> Violation Date: 05-20-2019 <br /> Citation: HSC 6.67 25270.4.5(a)-California Health and Safety Code,Chapter <br /> 6.67,Section(s)25270.4.5(a) <br /> Violation Description: Failure to adequately describe in the SPCC Plan,overfill prevention <br /> methods, including a description of the devices or systems in place <br /> for each container to prevent overfills. <br /> Violation Notes: Returned to compliance on 05/27/2020.The SPCC plan describes overfill <br /> prevention of vehicle tanks through automatic shutoff devices and <br /> states that tanker trucks that deliver fuels and oils to the facility <br /> are similarly equipped.The overfill prevention on the tanks,is not <br /> described in the SPCC plan. Engineer or update each container <br /> installation in accordance with good engineering practice to avoid <br /> discharges.You must provide at least one of the following devices: <br /> (i)High liquid level alarms with an audible or visual signal at a <br /> constantly attended operation or surveillance station. In smaller <br /> facilities an audible air vent may suffice.(ii)High liquid level <br /> pump cutoff devices set to stop flow at a predetermined container <br /> content level.(iii)Direct audible or code signal communication <br /> between the container gauger and the pumping station.(iv)A fast <br /> response system for determining the liquid level of each bulk storage <br /> container such as digital computers,telepulse,or direct vision <br /> gauges. If you use this a <br /> Violation Division: San Joaquin County Environmental Health <br /> Violation Program: APSA <br /> Violation Source: CERS <br /> Site ID: 273240 <br /> Site Name: MAXIM CRANE WORKS <br /> Violation Date: 07-02-2013 <br /> Citation: 2014-0057-DWQ-Industrial General Permit <br /> Violation Description: SW-Late Report <br /> Violation Notes: Failure to submit annual report by July 1,2013. <br /> Violation Division: Water Boards <br /> Violation Program: INDSTW <br /> Violation Source: SMARTS <br /> Site ID: 273240 <br /> Site Name: MAXIM CRANE WORKS <br /> Violation Date: 05-20-2019 <br /> Citation: HSC 6.67 25270.4.5(a)-California Health and Safety Code,Chapter <br /> 6.67,Section(s)25270.4.5(a) <br /> Violation Description: Failure to discuss in the SPCC Plan procedures to test or inspect each <br /> aboveground container for integrity in accordance with industry <br /> standards: 1.On a regular schedule.2.After material repairs are <br /> made.3. By qualified personnel.4.The frequency and type of testing <br /> and inspections based on container size,configuration,and design. <br /> Violation Notes: Returned to compliance on 06/03/2020.The SPCC plan calls for <br /> inspections/testing of the tanks to be conducted under the Steel Tank <br /> Institute(STI)SP-001 standard,2005 version.The latest edition of <br /> the STI SP-001 standard is the 6th edition, published in 2018.The <br /> SPCC plan does not determine in accordance with industry standards the <br /> appropriate qualifications for personnel performing tests and <br /> inspections,the frequency and type of testing and inspections,which <br /> take into account container size,configuration,and design.The SPCC <br /> plan does not mention the annual inspections to be conducted by <br /> TC6327721.2s Page 382 <br />
The URL can be used to link to this page
Your browser does not support the video tag.