My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
3009
>
2600 - Land Use Program
>
PA-2100031
>
SU0014056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:36:37 AM
Creation date
4/7/2021 2:18:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014056
PE
2666
FACILITY_NAME
PA-2100031
STREET_NUMBER
3009
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912011, -13, -14
ENTERED_DATE
4/7/2021 12:00:00 AM
SITE_LOCATION
3009 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pock Lane Residential Traffic Impact Study <br /> Tables <br /> Table 1: Signalized Intersection Delay and LOS Definitions.............................................................................................10 <br /> Table 2: Unsignalized Intersection Delay and LOS Definitions........................................................................................11 <br /> Table 3: Intersection Level of Service Analysis— Existing Conditions...........................................................................22 <br /> Table 4: New VMT Thresholds of Significance for San Joaquin County(Residential Projects)..........................23 <br /> Table 5: Home Based VMT per Capita Comparison............................................................................................................24 <br /> Table6: Project Trip Generation..................................................................................................................................................24 <br /> Table 7: Intersection Level of Service Analysis— Existing plus Project Conditions..................................................27 <br /> Table 8: Intersection Level of Service Analysis—Cumulative Conditions....................................................................30 <br /> Table 9: Intersection Level of Service Analysis—Cumulative plus Project Conditions...........................................33 <br /> Figures <br /> Figure1:Vicinity Map.........................................................................................................................................................................6 <br /> Figure 2a: Site Plan for 2706 Pock Lane......................................................................................................................................7 <br /> Figure2b: Site Plan for 3009 Pock Lane......................................................................................................................................8 <br /> Figure 3: Existing Pedestrian Facilities.......................................................................................................................................14 <br /> Figure4: Existing Bicycle Facilities..............................................................................................................................................16 <br /> Figure 5: Existing Transit Facilities..............................................................................................................................................18 <br /> Figure 6: Existing Lane Geometry and Traffic Controls......................................................................................................20 <br /> Figure 7: Existing Conditions Peak Hour Traffic Volumes.................................................................................................21 <br /> Figure 8: Project Trip Distribution and Assignment.............................................................................................................26 <br /> Figure 9: Existing plus Project Conditions Peak Hour Traffic Volumes........................................................................28 <br /> Figure 10: Cumulative No-Project Conditions Peak Hour Traffic Volumes................................................................31 <br /> Figure 11: Cumulative plus Project Conditions Peak Hour Traffic Volumes..............................................................34 <br /> Appendices <br /> Appendix A—Turning Movement Counts, ADT, and Historical ADT <br /> Appendix B— Pock Lane VMT Analysis <br /> Appendix C— Existing Conditions Intersections Level of Service Worksheets <br /> Appendix D— Existing plus Project Conditions Intersections Level of Service Worksheets <br /> Page I ii <br /> TJKM <br />
The URL can be used to link to this page
Your browser does not support the video tag.