My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
3009
>
2600 - Land Use Program
>
PA-2100031
>
SU0014056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:36:37 AM
Creation date
4/7/2021 2:18:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014056
PE
2666
FACILITY_NAME
PA-2100031
STREET_NUMBER
3009
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912011, -13, -14
ENTERED_DATE
4/7/2021 12:00:00 AM
SITE_LOCATION
3009 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pock Lane Residential Traffic Impact Study <br /> 3.3 EXISTING BICYCLE FACILITIES <br /> Bicycle paths, lanes and routes are typical examples of bicycle transportation facilities, which are defined <br /> by Caltrans as being in one of the following three classes: <br /> 1. Class I Multiuse Trail —a completely separated facility designed for the exclusive use of bicyclists and <br /> pedestrians with crossing points minimized. <br /> 2. Class 11 Bike Lane—a designated lane for the exclusive or semi-exclusive use of bicycles with through <br /> travel by motor vehicles or pedestrians prohibited, but with vehicle parking and cross-flows by <br /> pedestrians and motorists permitted. <br /> 3. Class III Bike Route—a route designated by signs or pavement markings and shared with pedestrians <br /> and motorists. <br /> 4. Class IV Separated Bikeway—an on-street facility reserved for use by bicyclists, with physical <br /> separation between the bikeway and travel lanes. Physical separation consists of vertical elements that <br /> may include curbs, landscaping, bollards, or parking lanes. <br /> In the project vicinity, there are existing Class II bike lanes on both sides of B Street between Ralph <br /> Avenue and 41h Street. There is a segment of Class I multiuse trail along Duck Creek, connecting B Street <br /> and Airport Way.A relatively extensive network of designated bike routes, bike lanes, and additional <br /> multiuse trails is proposed. These include bike lanes on Pock Lane and a designated bike route on 811 <br /> Street/Farmington Road.The existing and proposed bicycle facilities in the study area are shown in Figure <br /> 4. <br /> J0( Page 115 <br /> TJKM <br />
The URL can be used to link to this page
Your browser does not support the video tag.