Laserfiche WebLink
Pock Lane Residential Traffic Impact Study <br /> 4.4 INTERSECTION LEVEL OF SERVICE ANALYSIS- EXISTING PLUS PROJECT CONDITIONS <br /> The intersection LOS analysis results for Existing plus Project Conditions are summarized in Table 7. <br /> Under this scenario, all but one of the study intersections would continue to operate within applicable <br /> jurisdictional standards during both peak hours. The intersection of Pock Lane & Mariposa Road would <br /> continue degrade to LOS F in the p.m. peak hour, with an additional 2.5 seconds of delay, constituting a <br /> potentially significant impact.This impact can be mitigated with the addition of a northbound right turn <br /> lane. <br /> With mitigation, the project would be consistent with level of service standards set forth under the San <br /> Joaquin General Plan. <br /> A peak hour signal warrant analysis was also conducted for the unsignalized intersection of Pock Lane & <br /> Mariposa Road, to determine if a traffic signal is warranted.A signal is not warranted at this intersection <br /> during either peak hour. Figure 9 shows projected turning movement volumes at all the study <br /> intersections for Existing plus Project Conditions. LOS and peak hour signal warrant worksheets are <br /> provided in Appendix D. <br /> Table 7: Intersection Level of Service Analysis- Existing plus Project Conditions <br /> Existing Existing plus <br /> ID Intersection <br /> Intersection Peak Conditions Project Conditions <br /> Control Hour Average LOS2 Average LOSz Change Signal <br /> Delay' Delay' in Delay3 Warranted? <br /> 1 Mariposa Rd.&8th St. Signal AM 23.0 C 25.4 C 2.4 <br /> PM 29.2 C 38.3 D 9.1 <br /> 2 Pock Ln.&Mariposa Rd. Two-Way Stop AM 17.7 C 18.1 C 0.4 No <br /> PM 47.9 E 50.4 F 2.5 No <br /> Mitigation:add NB RT AM 176 C -0.1 <br /> lane PM 46.2 E -1.7 <br /> 3 Pock Ln.&8th St. All-Way Stop AM 11.2 B 13.9 B 2.7 <br /> PM 10.7 B 13.2 B 2.5 <br /> 4 Pock Ln.&Carpenter Rd. All-Way Stop AM 11.7 B 12.1 B 0.4 <br /> PM 10.2 B 10.5 B 0.3 <br /> 5 Pock Ln.&Togninali Ln. All-Way Stop AM 12.6 B 12.9 B 0.3 <br /> PM 9.6 A 9.7 A 0.1 <br /> 6 Pock Ln.&Boeing Way All-Way Stop AM 18.6 C 19.6 C 1.0 <br /> PM 9.3 A 9.5 A 0.2 <br /> 7 Pock Ln.&Loomis Rd. Two-Way Stop AM 11.4 B 13.4 B 2.0 <br /> PM 10.5 B 13.5 B 3.0 <br /> 8 Pock Ln.&Street A Two-Way Stop AM - - 11.4 B - <br /> PM - - 10.7 B - <br /> AM - - 11.0 B - <br /> 9 Pock Ln.&Street F/I Two-Way Stop PM - - 10.3 B - <br /> Notes:AM-morning peak hour, PM-evening peak hour,Weekend-Saturday noon peak hour, <br /> Bold indicates unacceptable operational conditions based on applicable jurisdictional standards.Red indicates significant impact. <br /> 1.Whole intersection weighted average control delay expressed in seconds per vehicle for signalized and all-way stop controlled <br /> intersections.Total control delay for the worst movement is presented for side-street stop-controlled intersections. <br /> 2.LOS= Level of Service <br /> 3.Change in average delay between Existing and Existing plus Project Conditions.Average delay may be reduced with the addition <br /> of project traffic to non-critical movements. <br /> 4.Change in critical volume to capacity ratio between Existing and Existing plus Project Condition <br /> -r Page 127 <br /> _.�KM <br />