My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
3009
>
2600 - Land Use Program
>
PA-2100031
>
SU0014056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:36:37 AM
Creation date
4/7/2021 2:18:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014056
PE
2666
FACILITY_NAME
PA-2100031
STREET_NUMBER
3009
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912011, -13, -14
ENTERED_DATE
4/7/2021 12:00:00 AM
SITE_LOCATION
3009 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pock Lane Residential Traffic Impact Study <br /> 5.0 CUMULATIVE NO-PROJECT • • (20 40) <br /> The Cumulative No-Project Conditions analysis forecasts how the study area's transportation system <br /> would operate with the growth and changes of the surrounding community by the year 2040. Corridor <br /> volumes on Pock Lane, 81" Street, and Mariposa Road in the immediate project vicinity were obtained <br /> from baseline year 2015 and horizon year 2042 in the SJCOG traffic model. Based on the growth in these <br /> corridor volumes, an annual compounding growth rate of 0.8 percent per year was applied to Existing <br /> Conditions to project future 2040 traffic volumes. <br /> Figure 10 shows projected turning movement volumes at the study intersections for Cumulative <br /> Conditions for a.m. and p.m. peak hours. <br /> 5.1 INTERSECTIONS LEVEL OF SERVICE ANALYSIS—CUMULATIVE NO-PROJECT CONDITIONS <br /> The intersection LOS analysis results for Cumulative No-Project Conditions are summarized in Table 8. <br /> Under this scenario, all but two intersections would continue to operate at acceptable LOS D or better. <br /> The stop-controlled intersection of Pock Lane & Mariposa Road would degrade to LOS F during the p.m. <br /> peak hour,with a substantial increase in average delay on the northbound (controlled) approach <br /> compared to Existing Conditions.The all-way stop intersection of Pock Lane & Boeing Way would <br /> degrade to LOS E in the a.m. peak hour. <br /> A peak hour signal warrant analysis was also conducted for the unsignalized intersection of Pock Lane & <br /> Mariposa Road,to determine if a traffic signal is warranted.A signal is not warranted at this intersection <br /> during either peak hour. LOS and peak hour signal warrant worksheets are provided in Appendix E. <br /> Page 129 <br /> TJKM <br />
The URL can be used to link to this page
Your browser does not support the video tag.