Laserfiche WebLink
HCM 6th Signalized Intersection Summary Timing Plan: AM Peak <br /> 1: Mariposa Rd & 8th St/Farmington Rd 1I05/03/2022 <br /> --I. -*.-- t t <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations 1� t r <br /> Traffic Volume(veh/h) 47 58 167 115 62 119 136 184 118 105 169 21 <br /> Future Volume(veh/h) 47 58 167 115 62 119 136 184 118 105 169 21 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.98 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,veh/h 50 62 178 167 90 172 155 209 134 124 199 25 <br /> Peak Hour Factor 0.94 0.94 0.94 0.69 0.69 0.69 0.88 0.88 0.88 0.85 0.85 0.85 <br /> Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,veh/h 87 89 255 212 529 439 196 259 166 159 364 46 <br /> Arrive On Green 0.05 0.21 0.21 0.12 0.28 0.28 0.11 0.24 0.24 0.09 0.22 0.22 <br /> Sat Flow,vehlh 1781 418 1199 1781 1870 1554 1781 1063 681 1781 1628 205 <br /> Grp Volume(v),veh/h 50 0 240 167 90 172 155 0 343 124 0 224 <br /> Grp Sat Flow(s),vehlh/In 1781 0 1617 1781 1870 1554 1781 0 1744 1781 0 1832 <br /> Q Serve(g_s),s 1.5 0.0 7.4 4.9 1.9 4.8 4.6 0.0 9.9 3.7 0.0 5.8 <br /> Cycle Q Clear(g_c),s 1.5 0.0 7.4 4.9 1.9 4.8 4.6 0.0 9.9 3.7 0.0 5.8 <br /> Prop In Lane 1.00 0.74 1.00 1.00 1.00 0.39 1.00 0.11 <br /> Lane Grp Cap(c),veh/h 87 0 344 212 529 439 196 0 426 159 0 409 <br /> V/C Ratio(X) 0.57 0.00 0.70 0.79 0.17 0.39 0.79 0.00 0.81 0.78 0.00 0.55 <br /> Avail Cap(c_a),veh/h 206 0 542 282 707 587 216 0 617 216 0 648 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 <br /> Uniform Delay(d),s/veh 25.0 0.0 19.5 23.0 14.5 15.5 23.3 0.0 19.1 24.0 0.0 18.5 <br /> Incr Delay(d2),s/veh 5.8 0.0 2.6 10.3 0.2 0.6 16.6 0.0 5.0 12.0 0.0 1.1 <br /> Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),veh/In 0.7 0.0 2.7 2.5 0.7 1.5 2.5 0.0 3.8 1.9 0.0 2.2 <br /> Unsig. Movement Delay,s/veh <br /> LnGrp Delay(d),s/veh 30.8 0.0 22.1 33.3 14.7 16.1 39.9 0.0 24.1 36.0 0.0 19.6 <br /> LnGrp LOS C A C C B B D A C D A B <br /> Approach Vol,veh/h 290 429 498 348 <br /> Approach Delay,s/veh 23.6 22.5 29.0 25.4 <br /> Approach LOS C C C C <br /> Timer-Assigned Phs 1 2 3 4 5 6 7 8 <br /> Phs Duration(G+Y+Rc),s 9.3 17.6 10.9 15.9 10.4 16.5 7.1 19.7 <br /> Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 <br /> Max Green Setting(Gmax),s 6.5 19.0 8.5 18.0 6.5 19.0 6.2 20.3 <br /> Max Q Clear Time(g_c+11),s 5.7 11.9 6.9 9.4 6.6 7.8 3.5 6.8 <br /> Green Ext Time(p-c),s 0.0 1.0 0.1 0.9 0.0 0.8 0.0 0.8 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 25.4 <br /> HCM 6th LOS C <br /> Pock Lane Residential TIS: Existing plus Project Conditions Synchro 11 Report <br /> TJKM Page 1 <br />