Laserfiche WebLink
HCM 6th Signalized Intersection Summary Timing Plan: AM Peak <br /> 1: Mariposa Rd & 8th St/Farmington Rd 1I05/03/2022 <br /> --I. -*.-- t t <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations 1� t r <br /> Traffic Volume(veh/h) 56 63 138 136 71 141 141 218 139 124 200 25 <br /> Future Volume(veh/h) 56 63 138 136 71 141 141 218 139 124 200 25 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.98 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,veh/h 60 67 147 197 103 204 160 248 158 146 235 29 <br /> Peak Hour Factor 0.94 0.94 0.94 0.69 0.69 0.69 0.88 0.88 0.88 0.85 0.85 0.85 <br /> Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,veh/h 94 97 214 242 512 425 194 287 183 184 431 53 <br /> Arrive On Green 0.05 0.19 0.19 0.14 0.27 0.27 0.11 0.27 0.27 0.10 0.26 0.26 <br /> Sat Flow,vehlh 1781 510 1119 1781 1870 1553 1781 1066 679 1781 1632 201 <br /> Grp Volume(v),veh/h 60 0 214 197 103 204 160 0 406 146 0 264 <br /> Grp Sat Flow(s),vehlh/In 1781 0 1630 1781 1870 1553 1781 0 1745 1781 0 1833 <br /> Q Serve(g_s),s 2.0 0.0 7.3 6.4 2.5 6.6 5.3 0.0 13.3 4.8 0.0 7.4 <br /> Cycle Q Clear(g_c),s 2.0 0.0 7.3 6.4 2.5 6.6 5.3 0.0 13.3 4.8 0.0 7.4 <br /> Prop In Lane 1.00 0.69 1.00 1.00 1.00 0.39 1.00 0.11 <br /> Lane Grp Cap(c),veh/h 94 0 311 242 512 425 194 0 470 184 0 484 <br /> V/C Ratio(X) 0.64 0.00 0.69 0.82 0.20 0.48 0.83 0.00 0.86 0.79 0.00 0.55 <br /> Avail Cap(c_a),veh/h 185 0 490 253 635 527 194 0 554 194 0 582 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 <br /> Uniform Delay(d),s/veh 27.8 0.0 22.5 25.1 16.7 18.2 26.1 0.0 20.8 26.2 0.0 18.9 <br /> Incr Delay(d2),s/veh 7.0 0.0 2.7 17.7 0.2 0.8 24.6 0.0 11.8 19.0 0.0 1.0 <br /> Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),veh/In 1.0 0.0 2.8 3.7 1.0 2.2 3.3 0.0 6.0 2.8 0.0 2.8 <br /> Unsig. Movement Delay,s/veh <br /> LnGrp Delay(d),s/veh 34.8 0.0 25.3 42.8 16.9 19.0 50.7 0.0 32.7 45.2 0.0 19.9 <br /> LnGrp LOS C A C D B B D A C D A B <br /> Approach Vol,veh/h 274 504 566 410 <br /> Approach Delay,s/veh 27.3 27.9 37.7 28.9 <br /> Approach LOS C C D C <br /> Timer-Assigned Phs 1 2 3 4 5 6 7 8 <br /> Phs Duration(G+Y+Rc),s 10.7 20.6 12.6 15.9 11.0 20.3 7.7 20.9 <br /> Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 <br /> Max Green Setting(Gmax),s 6.5 19.0 8.5 18.0 6.5 19.0 6.2 20.3 <br /> Max Q Clear Time(g_c+11),s 6.8 15.3 8.4 9.3 7.3 9.4 4.0 8.6 <br /> Green Ext Time(p-c),s 0.0 0.8 0.0 0.7 0.0 0.9 0.0 0.9 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 31.2 <br /> HCM 6th LOS C <br /> Pock Lane Residential TIS:Cumulative Conditions Synchro 11 Report <br /> TJKM Page 1 <br />