Laserfiche WebLink
HCM 6th Signalized Intersection Summary Timing Plan: PM Peak <br /> 1: Mariposa Rd & 8th St/Farmington Rd 1I05/03/2022 <br /> --I. -*.-- t t <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations 1� t r <br /> Traffic Volume(veh/h) 86 67 164 116 65 121 167 335 131 126 441 57 <br /> Future Volume(veh/h) 86 67 164 116 65 121 167 335 131 126 441 57 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,veh/h 115 89 219 126 71 132 182 364 142 150 525 68 <br /> Peak Hour Factor 0.75 0.75 0.75 0.92 0.92 0.92 0.92 0.92 0.92 0.84 0.84 0.84 <br /> Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,veh/h 134 103 255 159 433 363 208 435 170 189 534 69 <br /> Arrive On Green 0.08 0.22 0.22 0.09 0.23 0.23 0.12 0.34 0.34 0.11 0.33 0.33 <br /> Sat Flow,vehlh 1781 475 1169 1781 1870 1568 1781 1280 499 1781 1622 210 <br /> Grp Volume(v),veh/h 115 0 308 126 71 132 182 0 506 150 0 593 <br /> Grp Sat Flow(s),vehlh/In 1781 0 1644 1781 1870 1568 1781 0 1780 1781 0 1832 <br /> Q Serve(g_s),s 4.6 0.0 13.1 5.1 2.2 5.1 7.3 0.0 19.1 6.0 0.0 23.4 <br /> Cycle Q Clear(g_c),s 4.6 0.0 13.1 5.1 2.2 5.1 7.3 0.0 19.1 6.0 0.0 23.4 <br /> Prop In Lane 1.00 0.71 1.00 1.00 1.00 0.28 1.00 0.11 <br /> Lane Grp Cap(c),veh/h 134 0 358 159 433 363 208 0 605 189 0 603 <br /> V/C Ratio(X) 0.86 0.00 0.86 0.79 0.16 0.36 0.88 0.00 0.84 0.80 0.00 0.98 <br /> Avail Cap(c_a),veh/h 134 0 406 159 488 409 208 0 605 284 0 603 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 <br /> Uniform Delay(d),s/veh 33.3 0.0 27.4 32.5 22.4 23.5 31.7 0.0 22.2 31.8 0.0 24.2 <br /> Incr Delay(d2),s/veh 38.5 0.0 15.4 23.4 0.2 0.6 31.5 0.0 9.9 8.9 0.0 32.1 <br /> Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),veh/In 3.4 0.0 6.4 3.1 0.9 1.9 4.7 0.0 8.4 2.8 0.0 14.2 <br /> Unsig. Movement Delay,s/veh <br /> LnGrp Delay(d),s/veh 71.8 0.0 42.9 55.9 22.5 24.1 63.2 0.0 32.1 40.7 0.0 56.4 <br /> LnGrp LOS E A D E C C E A C D A E <br /> Approach Vol,veh/h 423 329 688 743 <br /> Approach Delay,s/veh 50.7 36.0 40.3 53.2 <br /> Approach LOS D D D D <br /> Timer-Assigned Phs 1 2 3 4 5 6 7 8 <br /> Phs Duration(G+Y+Rc),s 12.2 29.3 11.0 20.4 13.0 28.5 10.0 21.4 <br /> Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 <br /> Max Green Setting(Gmax),s 11.6 20.9 6.5 18.0 8.5 24.0 5.5 19.0 <br /> Max Q Clear Time(g_c+11),s 8.0 21.1 7.1 15.1 9.3 25.4 6.6 7.1 <br /> Green Ext Time(p-c),s 0.1 0.0 0.0 0.5 0.0 0.0 0.0 0.6 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 46.1 <br /> HCM 6th LOS D <br /> Pock Lane Residential TIS:Cumulative Conditions Synchro 11 Report <br /> TJKM Page 1 <br />