Laserfiche WebLink
HCM 6th Signalized Intersection Summary Timing Plan: AM Peak <br /> 1: Mariposa Rd & 8th St/Farmington Rd 1I05/03/2022 <br /> --I. -*.-- t t <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations 1� t r <br /> Traffic Volume(veh/h) 56 68 188 136 73 141 158 218 139 124 200 25 <br /> Future Volume(veh/h) 56 68 188 136 73 141 158 218 139 124 200 25 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.98 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,veh/h 60 72 200 197 106 204 180 248 158 146 235 29 <br /> Peak Hour Factor 0.94 0.94 0.94 0.69 0.69 0.69 0.88 0.88 0.88 0.85 0.85 0.85 <br /> Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,veh/h 92 93 258 238 559 465 182 282 180 182 432 53 <br /> Arrive On Green 0.05 0.22 0.22 0.13 0.30 0.30 0.10 0.26 0.26 0.10 0.26 0.26 <br /> Sat Flow,vehlh 1781 429 1191 1781 1870 1556 1781 1066 679 1781 1632 201 <br /> Grp Volume(v),veh/h 60 0 272 197 106 204 180 0 406 146 0 264 <br /> Grp Sat Flow(s),vehlh/In 1781 0 1619 1781 1870 1556 1781 0 1745 1781 0 1833 <br /> Q Serve(g_s),s 2.1 0.0 10.1 6.9 2.7 6.7 6.4 0.0 14.2 5.1 0.0 7.9 <br /> Cycle Q Clear(g_c),s 2.1 0.0 10.1 6.9 2.7 6.7 6.4 0.0 14.2 5.1 0.0 7.9 <br /> Prop In Lane 1.00 0.74 1.00 1.00 1.00 0.39 1.00 0.11 <br /> Lane Grp Cap(c),veh/h 92 0 351 238 559 465 182 0 462 182 0 485 <br /> V/C Ratio(X) 0.66 0.00 0.78 0.83 0.19 0.44 0.99 0.00 0.88 0.80 0.00 0.54 <br /> Avail Cap(c_a),veh/h 174 0 458 238 597 497 182 0 521 182 0 548 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 <br /> Uniform Delay(d),s/veh 29.6 0.0 23.5 26.8 16.6 18.0 28.5 0.0 22.4 27.9 0.0 20.1 <br /> Incr Delay(d2),s/veh 7.7 0.0 6.1 20.9 0.2 0.7 63.3 0.0 14.6 22.1 0.0 1.0 <br /> Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),veh/In 1.0 0.0 4.1 4.1 1.1 2.3 5.6 0.0 6.7 3.1 0.0 3.0 <br /> Unsig. Movement Delay,s/veh <br /> LnGrp Delay(d),s/veh 37.3 0.0 29.6 47.7 16.7 18.7 91.8 0.0 37.0 50.1 0.0 21.0 <br /> LnGrp LOS D A C D B B F A D D A C <br /> Approach Vol,veh/h 332 507 586 410 <br /> Approach Delay,s/veh 31.0 29.5 53.8 31.4 <br /> Approach LOS C C D C <br /> Timer-Assigned Phs 1 2 3 4 5 6 7 8 <br /> Phs Duration(G+Y+Rc),s 11.0 21.3 13.0 18.3 11.0 21.3 7.8 23.5 <br /> Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 <br /> Max Green Setting(Gmax),s 6.5 19.0 8.5 18.0 6.5 19.0 6.2 20.3 <br /> Max Q Clear Time(g_c+11),s 7.1 16.2 8.9 12.1 8.4 9.9 4.1 8.7 <br /> Green Ext Time(p-c),s 0.0 0.6 0.0 0.8 0.0 0.9 0.0 0.9 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 38.0 <br /> HCM 6th LOS D <br /> Pock Lane Residential TIS:Cumulative plus Project Conditions Synchro 11 Report <br /> TJKM Page 1 <br />