Laserfiche WebLink
HCM 6th Signalized Intersection Summary Timing Plan: AM Peak <br /> 1: Mariposa Rd & 8th St/Farmington Rd 1I05/03/2022 <br /> --I. -*.-- t t <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations 1� t r <br /> Traffic Volume(veh/h) 56 68 188 136 73 141 158 218 139 124 200 25 <br /> Future Volume(veh/h) 56 68 188 136 73 141 158 218 139 124 200 25 <br /> Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.98 1.00 1.00 1.00 1.00 <br /> Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Work Zone On Approach No No No No <br /> Adj Sat Flow,vehlh/In 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br /> Adj Flow Rate,veh/h 60 72 200 197 106 204 180 248 158 146 235 29 <br /> Peak Hour Factor 0.94 0.94 0.94 0.69 0.69 0.69 0.88 0.88 0.88 0.85 0.85 0.85 <br /> Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 <br /> Cap,veh/h 90 92 255 242 561 466 224 288 184 185 405 50 <br /> Arrive On Green 0.05 0.21 0.21 0.14 0.30 0.30 0.13 0.27 0.27 0.10 0.25 0.25 <br /> Sat Flow,vehlh 1781 429 1191 1781 1870 1556 1781 1066 679 1781 1632 201 <br /> Grp Volume(v),veh/h 60 0 272 197 106 204 180 0 406 146 0 264 <br /> Grp Sat Flow(s),vehlh/In 1781 0 1619 1781 1870 1556 1781 0 1745 1781 0 1833 <br /> Q Serve(g_s),s 2.2 0.0 10.4 7.0 2.8 6.9 6.4 0.0 14.5 5.2 0.0 8.3 <br /> Cycle Q Clear(g_c),s 2.2 0.0 10.4 7.0 2.8 6.9 6.4 0.0 14.5 5.2 0.0 8.3 <br /> Prop In Lane 1.00 0.74 1.00 1.00 1.00 0.39 1.00 0.11 <br /> Lane Grp Cap(c),veh/h 90 0 347 242 561 466 224 0 472 185 0 455 <br /> V/C Ratio(X) 0.66 0.00 0.78 0.81 0.19 0.44 0.80 0.00 0.86 0.79 0.00 0.58 <br /> Avail Cap(c_a),veh/h 191 0 446 313 644 535 319 0 614 259 0 583 <br /> HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 <br /> Uniform Delay(d),s/veh 30.5 0.0 24.2 27.4 17.0 18.5 27.8 0.0 22.7 28.6 0.0 21.6 <br /> Incr Delay(d2),s/veh 8.1 0.0 6.8 11.8 0.2 0.6 9.4 0.0 9.6 10.4 0.0 1.2 <br /> Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br /> %ile BackOfQ(50%),veh/In 1.1 0.0 4.3 3.6 1.1 2.3 3.0 0.0 6.3 2.6 0.0 3.3 <br /> Unsig. Movement Delay,s/veh <br /> LnGrp Delay(d),s/veh 38.5 0.0 31.1 39.3 17.2 19.1 37.1 0.0 32.2 39.0 0.0 22.8 <br /> LnGrp LOS D A C D B B D A C D A C <br /> Approach Vol,veh/h 332 507 586 410 <br /> Approach Delay,s/veh 32.4 26.5 33.7 28.5 <br /> Approach LOS C C C C <br /> Timer-Assigned Phs 1 2 3 4 5 6 7 8 <br /> Phs Duration(G+Y+Rc),s 11.3 22.2 13.4 18.5 12.7 20.7 7.8 24.1 <br /> Change Period (Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 <br /> Max Green Setting(Gmax),s 9.5 23.0 11.5 18.0 11.7 20.8 7.0 22.5 <br /> Max Q Clear Time(g_c+11),s 7.2 16.5 9.0 12.4 8.4 10.3 4.2 8.9 <br /> Green Ext Time(p-c),s 0.1 1.2 0.1 0.7 0.1 0.9 0.0 1.0 <br /> Intersection Summary <br /> HCM 6th Ctrl Delay 30.3 <br /> HCM 6th LOS C <br /> Pock Lane Residential TIS:Cumulative plus Project Conditions-Non-Signal Mitigation Synchro 11 Report <br /> TJKM Page 1 <br />