Laserfiche WebLink
. _................................ ......................................... ............................. .. ...................................-.-...-........ ................. .... . __ <br /> Mitigation Monitoring Reporting Plan-PA-2100032,and PA-2100062 May 2022 <br /> Agen ey for Monitoring and Reporting <br /> 1p,.t Mit(stion Measure Conditfon Typeof Review Carl Action lndreatrng Compliance or Review Verification ofcot pirance or Annual Review of Conditic <br /> M.nftorfrur Reportl By Date Remarks <br /> BJ Resources Participator in the SIMSCP x San Joaquin Council oFGovemments The developer shall apply to the San Joaquin Council of Govemment <br /> (S1C0G)for coverage under the San Joaquin County Multi-Spedes Open <br /> Space and Habitat Conservation Plan(SIMSCP).The project site shall be <br /> inspected by the SIMSCP biolcgis4 who will recommend which Incidental <br /> :Take Minimization Measures set forth In the SIMSCP should be applied <br /> to the project and implemented.The project applicant shall pay the <br /> required SIMSCP fee,if any,and be responsible for theimplementation <br /> of the specified Incidental Take Mrnimrzsdon Measures. <br /> al Resources Fish and Wildlife Movement x Community Development Department If treeremoval is scheduled during the nesting season of raptors[January 1 <br /> through July 31),a pre-construction survey for nesting rations shall be <br /> conducted.If vegetation removal cr construction commences during the <br /> general avian nesting season(March 1 through September 151,a pre <br /> construction survey For all species of nesting birds shall be conducted.if <br /> active nests for any bird species are found,work in the vicinity of nests <br /> shall be delayed until the young have fledged.No surveys shall berequired <br /> IF Vee removal occurs outside January 1 through July 31,or if other <br /> vegetation removal or construction occurs outside March 1 through <br /> Septemberl5. <br /> Resources Archaeological Resources x Commurity Development Department If any subsurface cultural resources are encountered during <br /> construction of the project all constructionactiv(deswithin 100 feetof <br /> the encounter shall be halted until a qualified archaedogistcan examine <br /> thesematerials,determine their significance and,rfsignifrcant recommend <br /> further mrtigadon measures diatwould reduce potential effects toa level <br /> thatis less than significant Recommended measures could include,butare <br /> not limited to,l)preservation in place,21 incorporation ofchange in design <br /> to ensure no further disturbance ofencountered resource;cr3) <br /> excavation,recovery,and arration by qualified professionals The County <br /> Community Development Department shall be nodged,and the project <br /> developer shall be responsible for retaining qualified professionals, <br /> implementing recommended mitigation measures,and documenting <br /> mitigation effortsin a written report to the Community Development <br /> Department consistentwith therequirementsof the CEOA Guidelines. <br />