Laserfiche WebLink
power to the streetlights(including application to Pacific Gas and Electric Company and installation of <br /> any necessary power facilities)(Development Title Section 9-1150.11) <br /> m. The project shall be served by a public storm drain system with terminal drainage in accordance with <br /> the County requirements and to provide adequate drainage for the subdivision. Hydrologic and <br /> hydraulic analyses shall be provided and demonstrate that all property, both downstream and <br /> upstream of the discharge, will not be subject to a higher flood level as a result of the proposed <br /> drainage. (Development Title Section 9-1135.2) <br /> n. Applicant shall provide a will-serve letter from an existing district or agency for storm drainage, <br /> including storm drain treatment as applicable, and street lighting or form a new community services <br /> district, community facilities district or other non-County public utility agency to provide for operation <br /> and maintenance of the storm drain system and streetlights in perpetuity.Applicant is responsible for <br /> initial financing, design and construction of the infrastructure facilities, subject to County review and <br /> approval.Any new district or public utility agency shall be created prior to approval of the Final Map. <br /> o. The project shall be served by a public water system conforming to the requirements of the San <br /> Joaquin County Public Health Services, Environmental Health Department and the Department of <br /> Public Works. The system shall provide adequate domestic and fire water supply in conformance to <br /> the requirements of the County Fire Warden and the local Fire District. (Development Title Section 9- <br /> 1120.2) <br /> p. The project shall be served by a public sewer collection and treatment system constructed in <br /> conformance with the requirements of the San Joaquin County Public Health Services Environmental <br /> Services Division and the Department of Public Works. (Development Title Section 9-1105.2) <br /> q. Access rights shall be dedicated and restricted for lots 47-51, 80 and 104-108 along the frontage of <br /> Pock Lane on the Final Map. (Development Title Section 9-1150.5) <br /> r. This project is a NPDES Phase II regulated area and shall comply with the following conditions. Prior <br /> to approval of the final map, plans and calculations shall be submitted and approved by the Public <br /> Works Department—Water Resources Division (209-468-9360): <br /> 1. Treatment: A registered professional engineer shall design the site to treat the 85th percentile <br /> storm as defined in the County's 2021 Storm Water Quality Control Criteria Plan (SWQCCP) <br /> 2. Hydromodification: A registered professional engineer shall design the site to comply with the <br /> volume reduction requirement outlined in the County's 2021 SWQCCP. <br /> s. Applicant shall file a Notice of Intent(NOI)with the State Water Resources Control Board (SWRCB) <br /> and comply with the State"General Permit for Storm Water Discharges Associated with Construction <br /> Activity'.The Waste Discharge Identification Number(WDID), issued by SWRCB, shall be submitted <br /> to Public Works for file. Contact the SWRCB at(916) 341-5250 for further information. <br /> t. Applicant shall submit the Storm Water Pollution Prevention Plan (SWPPP)to Public Works.A copy <br /> of the approved SWPPP and all required records, updates,test results and inspection reports shall be <br /> maintained on the construction site and be available for review upon request. <br /> u. Prior to approval of the Final Map,the owner shall enter into an agreement with San Joaquin County <br /> for post-construction maintenance of stormwater quality facilities. <br /> v. The applicant shall develop a drainage study to ensure the project does not adversely impact the 100- <br /> year floodplain in Duck Creek. The study shall be approved by Public Works prior to approval of the <br /> final map. <br /> w. Encroachments into the FEMA Floodway shall demonstrate no net rise to the 100-year base flood <br /> elevation. <br /> PA-2100031, 32, 61, 62 (ZR, SU) Conditions of Approval 3 <br />