Laserfiche WebLink
SAN10 A Q U I N Department of Public Works <br /> t a Kris Balaji,Director of Public Works <br /> --C0(J!`JTY - :f <br /> Fritz Buchman,Deputy Directc;lDevelepment <br /> YOU David Tolliver,Decuty DircrouO ra <br /> eafdog frac tans <br /> Najee 2arif,Dc puty Dnector!Engineering <br /> May 6,2022 Kristi Rhea,Business Administra!or <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON:Giuseppe Sanfilippo AC <br /> FROM: Alex Chetley, Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-2100061 (ZR)&-062(SU);A Zone Reclassification and Vested Major Subdivision <br /> application.The Zone Reclassification proposes to rezone two(2)parcels totaling 19.3- <br /> acres from Agricultural Urban Reserve—20-acre minimum(AU-20)to Low Density <br /> Residential(R-L).The General Plan designation is Low Density Residential(R/L).The <br /> underlying project is a Major Subdivision to subdivide the two(2)parcels totaling 19.3- <br /> acres into ninety-six(96)residential lots;located on the east side of South Pock Lane, <br /> 2,076 feet south of East Eighth Street, Stockton.(Supervisorial District 1) <br /> OWNER:Yolanda Sanchez APPLICANT:Pock Lane Partners, LLC. <br /> ADDRESS: 2706 South Pock Lane,Stockton APN: 179-120-13&-14 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> The site is within the Phase 2 area of the National Pollutant Discharge Elimination System(NPDES)= <br /> Pock Lane has an existing and planned right-of-way width of 50 feet. <br /> Loomis Road has an existing and planned right-of-way width of 60 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed.The fee is due <br /> and payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when parcels are developed. The <br /> fee is due and payable at the time of building permit application <br /> '1810 East Hazelton Avenue ( Stockton,California 95205 j T 209 468 3000 1 F 209 468 2999 <br /> gi Follow us on Facebook,ci),PublicWorksSJG Visit ourwebsite: www.sigov.org/pubwarks <br /> PA-2100031, 32, 61, 62 (ZR, SU) Response Letters 14 <br />