Laserfiche WebLink
31SJCz(_.)G1 Inc. <br /> S J C 0 G,]Enc. <br /> Samjoaqidii Cou#!y.Ab11V-Spedes1Libi1a1 Corsenalion c!;'Open Space I1/an <br /> 555 East Weber Avenue a Stocktm CA 95202-(209)235-0600- FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department,Planning Department,Building <br /> Department,Engineering Department,SurveV Department,Transportation Department,Public <br /> Works Department, <br /> Other: <br /> FROM: Laurel Boyd,SJC0G,Inc. <br /> DONOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE. FOR THIS PROJECT <br /> The landowner/developer forthis site has requested coverage pursuant to the San Joaquin County Mufti- <br /> Species Habitat Conservation and Open Space Plan(SJMSCP). In accordance with that agreement,the <br /> Applicant has agreed to: <br /> I SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take hfirtimization h4easures(ITKSis)will be issued to the project and must be signed by the <br /> project applicant prior to any ground clLsturbance but no later than six(6)months from receipt of the 1rl,4-Ms. <br /> 1f1TNfl%1s are not signed within six months,the applicant must reapply for SJMSCP Coverage. UM)nrcccipt <br /> of signed 11104s from project applicant,SIC00,Inc.staff will sign the ITIWs. This is the effective date <br /> of the rfl^fi. <br /> 2. Under no circumstance shall wound disturbance occur without compliance and satisfaction of the rrM945 <br /> 3. Upon issuance of fully executed ITI,&4s and prior to any ground disturbance,the project applicant must: <br /> a- Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 m cath period);or <br /> b. Pay the appropriate SMSCP fee for the entirety of the project acreage being covered,or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date,of the 117"Is or issuance of a building permit,whichever occurs <br /> first the project applicant must: <br /> a. Pay the appropriate SA SCP for the entirety of the project acreage being covered,or <br /> b. Dedicate land in-lieu of fees,either as conservation casements or fee title;or <br /> c. Purchase approved mitigation bank-credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to he called. <br /> Project Title:PA-2100032(SU),PA-210006I(ZR),PA-21000621-5 <br /> Landowner: Yolanda Sanchez,Pock Line Partners,LLC Applicant:Pock Lane Partners,LLC <br /> Assessor Parcel#sj1J2-J2!LL1_-1J_-3A <br /> T R SeCtiDn(s): <br /> Local Jurisdiction Contact:Giuseppe Sanfilippo <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly Implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br /> PA-2100031, 32, 61, 62 (ZR, SU) Response Letters 26 <br />