Laserfiche WebLink
Map ID MAP FINDINGS <br /> Direction <br /> Distance EDR ID Number <br /> Elevation Site Database(s) EPA ID Number <br /> POCK LANE COMMUNITY SCHOOL (Continued) S105754276 <br /> Future Area Name: Not reported <br /> Future Sub Area Name: Not reported <br /> Future Document Type: Not reported <br /> Future Due Date: Not reported <br /> Schedule Area Name: Not reported <br /> Schedule Sub Area Name: Not reported <br /> Schedule Document Type: Not reported <br /> Schedule Due Date: Not reported <br /> Schedule Revised Date: Not reported <br /> C22 NATIONAL FREIGHT LUST S101308469 <br /> East 2850 LOOMIS RD E Cortese N/A <br /> 1/8-1/4 STOCKTON,CA 95205 HIST CORTESE <br /> 0.140 mi. CERS <br /> 738 ft. Site 2 of 4 in cluster C <br /> Relative: LUST REG 5: <br /> Higher Name: NATIONAL FREIGHT <br /> Actual: Address: 2850 LOOMIS RD E <br /> 28 ft. City: STOCKTON <br /> Region: 5 <br /> Status: Leak being confirmed <br /> Case Number: 390314 <br /> Case Type: Drinking Water Aquifer affected <br /> Substance: DIESEL <br /> Staff Initials: JLB <br /> Lead Agency: Local <br /> Program: LUST <br /> MTBE Code: 1 <br /> LUST: <br /> Name: NATIONAL FREIGHT <br /> Address: 2850 LOOMIS RD E <br /> City,State,Zip: STOCKTON,CA 95205 <br /> Lead Agency: SAN JOAQUIN COUNTY <br /> Case Type: LUST Cleanup Site <br /> Geo Track: http://geotracker.waterboards.ca.gov/profile_report.asp?global_id=T0607700231 <br /> Global Id: T0607700231 <br /> Latitude: 37.9304225 <br /> Longitude: -121.2372337 <br /> Status: Completed-Case Closed <br /> Status Date: 05/30/2012 <br /> Case Worker: Not reported <br /> RB Case Number: 390314 <br /> Local Agency: Not reported <br /> File Location: Local Agency <br /> Local Case Number: 1651 <br /> Potential Media Affect: Aquifer used for drinking water supply <br /> Potential Contaminants of Concern: Diesel <br /> Site History: October 1996-One waste oil tank was removed from the site. <br /> September 1998-Two USTs,associated piping,and two dispensers were <br /> removed from the site.September 1999-Two soil borings(P-1 and <br /> P-2)were advanced at the site.August 2000-Soil boring P-3 was <br /> advanced and monitoring wells MW-1 through MW-3 were installed.June <br /> 2001 -a sensitive receptor survey was performed.February 2002- <br /> MW-4 was installed onsite,soil boring B-1 was advanced off-site,and <br /> MW-5 was installed off-site.October 30,2006 to November 10,2006- <br /> TC6327721.2s Page 86 <br />