Laserfiche WebLink
SJCOG, Inc. <br /> 555 East Weber Avenue •Stockton,CA 95202• (209)235-0600•FAX(209)235-0438 <br /> IL <br /> • San Joaquin County Multi-Species Habitat Conservation & <br /> Open Space Plan (SJMSCP) <br /> Leo tuber <br /> GiAIR 2022 Updated Habitat Fees* <br /> Robert RmW= <br /> "`CE`HAm Habitat Type Fee Per Acre <br /> Dime Nguyen <br /> PRESIDENT Multi-Purpose Open Space $99781 <br /> Member Agencies Natural $199561 <br /> CITIESoF <br /> ESGALON, Agriculture $19,561 <br /> LA=CLODL Vernal Pool - upland $80,453 <br /> ODL <br /> �N Vernal Pool - wetted $1749040 <br /> SPOCKMN, *Effective January 1,2022—December 31,2022 <br /> TRACY, <br /> AND <br /> THECOUNTYOF <br /> SAN°AQUN 2022 Endowment Fees with In-lieu Land** <br /> Enhancement Land TOTAL PER <br /> Type of Preserve Cost/acre Management ACRE <br /> Cost/acre ENDOWMENT <br /> Agricultural Habitat Lands $5,256.00 $710.96 $5,966.96 <br /> Natural Lands $5,256.00 $710.96 $5,966.96 <br /> Vernal Pool Habitat <br /> Vernal Pool Grasslands $13,390.00 $1,756.01 $15,146.01 <br /> Vernal Pool Wetted $108,136.00 $1,721.56 $109,857.56 <br /> **Effective January 1,2022—December 31,2022 in lieu of fees to be used as the endowment for the <br /> dedicated land preserves(Category B+C)based on impacted acres. <br /> VELB Mitigation <br /> A special fee category shall apply when removal of the Valley Elderberry Long-horned Beatle <br /> (VELB) habitat of elderberry shrubs occurs. The fee shall be paid to SJCOG, Inc. or a VELB <br /> mitigation bank approved by the Permitting Agencies. The current fee, as established in the VELB <br /> Conservation Fund Account managed by the Center for Natural Lands Management,and approved by <br /> the USFWS, is$1,800 per VELB Unit(one unit=one stem over 1" in diameter at ground level which <br /> is removed). Fees shall be established by the JPA during preconstruction surveys(i.e.,counts of stems <br /> to be removed with and without exit holes shall be completed during preconstruction surveys) and <br /> shall be paid to the JPA prior to ground disturbance or stem removal,whichever comes first. <br />