Laserfiche WebLink
.ONITORING WELL INSTALLATION REPG. <br /> Date: CONSTRUCTION <br /> Premise Address: Total Depth <br /> Screen Length (from) (to) <br /> Well No.: Filter Pack (from) (to) <br /> Bentonite (from) (to) <br /> Inspector: Grout (from) (to) <br /> Drilling rig type <br /> Permit No. Auger O.D. I.D. <br /> Completion - Stove pipe/christie box (circle one) <br /> Drilling Company: <br /> Driller: casing <br /> height <br /> Consultant <br /> -qVT <br /> Geologist •- <br /> ABOVE-GROUND CHSISTY-SOX <br /> COMPLETION COMPLETICN <br /> SPECIAL PERMIT INFO. Ground Surface <br /> Distance to sewer line grout <br /> Domestic well on site - (y/ n ) <br /> If yes, location and distance - ft. <br /> ft ft. <br /> = m <br /> 0 <br /> SAMPLING •lotted = <br /> aeoaon <br /> Holdin Temperature = I2VW Pk <br /> Method '� <br /> Screening Method <br /> Tracking Sheet ( y/ n ) _ <br /> ft. <br /> SPOILS <br /> Storage Method MATERIALS/DEVELOPMENT <br /> Contamination Noted - (y/ n ) <br /> Storage Location Casing type <br /> Blank ft. Screen ft. <br /> Slot size <br /> GROUTING Bags cement <br /> I; Buckets bentonite <br /> Depth to water Cl Bags sand/gravel <br /> Mix Ratios Filter Pack type/size <br /> Installation Method Surge Block: - ( y/ n ) <br /> Quantity Installed Discussed with geologist: - ( y/ n ) <br /> Type of method <br /> EH 29 29 <br />