Laserfiche WebLink
PA-2100045 Project 25 August 2021 <br /> San Joaquin County <br /> Construction Storm Water General Permit <br /> Dischargers whose project disturb one or more acres of soil or where projects <br /> disturb less than one acre but are part of a larger common plan of development that <br /> in total disturbs one or more acres, are required to obtain coverage under the <br /> General Permit for Storm Water Discharges Associated with Construction and Land <br /> Disturbance Activities (Construction General Permit), Construction General Permit <br /> Order No. 2009-0009-DWQ. Construction activity subject to this permit includes <br /> clearing, grading, grubbing, disturbances to the ground, such as stockpiling, or <br /> excavation, but does not include regular maintenance activities performed to restore <br /> the original line, grade, or capacity of the facility. The Construction General Permit <br /> requires the development and implementation of a Storm Water Pollution Prevention <br /> Plan (SWPPP). For more information on the Construction General Permit, visit the <br /> State Water Resources Control Board website at: <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/constperm its.sht <br /> ml <br /> Industrial Storm Water General Permit <br /> Storm water discharges associated with industrial sites must comply with the <br /> regulations contained in the Industrial Storm Water General Permit Order No. 2014- <br /> 0057-DWQ. For more information on the Industrial Storm Water General Permit, <br /> visit the Central Valley Water Board website at: <br /> http://www.waterboards.ca.gov/centraIvaIley/water issues/storm water/industrial ge <br /> neral Perm its/index.shtmI <br /> Clean Water Act Section 404 Permit <br /> If the project will involve the discharge of dredged or fill material in navigable waters <br /> or wetlands, a permit pursuant to Section 404 of the Clean Water Act may be <br /> needed from the United States Army Corps of Engineers (USACE). If a Section 404 <br /> permit is required by the USACE, the Central Valley Water Board will review the <br /> permit application to ensure that discharge will not violate water quality standards. If <br /> the project requires surface water drainage realignment, the applicant is advised to <br /> contact the Department of Fish and Game for information on Streambed Alteration <br /> Permit requirements. If you have any questions regarding the Clean Water Act <br /> Section 404 permits, please contact the Regulatory Division of the Sacramento <br /> District of USACE at (916) 557-5250. <br /> Clean Water Act Section 401 Permit—Water Quality Certification <br /> If an USACE permit (e.g., Non-Reporting Nationwide Permit, Nationwide Permit, <br /> Letter of Permission, Individual Permit, Regional General Permit, Programmatic <br /> General Permit), or any other federal permit (e.g., Section 10 of the Rivers and <br /> Harbors Act or Section 9 from the United States Coast Guard), is required for this <br /> project due to the disturbance of waters of the United States (such as streams and <br /> wetlands), then a Water Quality Certification must be obtained from the Central <br /> Valley Water Board prior to initiation of project activities. There are no waivers for <br /> 401 Water Quality Certifications. For more information on the Water Quality <br /> Certification, visit the Central Valley Water Board website at: <br />