3 —Construction Activities <br />Dust or Noise Mitigation <br />Vehicles driven on unpaved roads will travel at speeds that minimize dust. If reducing traveling speeds on <br />unpaved roads is not enough to control dust, then the roads used by work crews will be sufficiently sprayed with <br />water at the beginning of each day. Wetting will occur more frequently during the day or night as needed to <br />prevent the occurrence of dust nuisance. <br />Drilling and Well Construction <br />Work crews will mobilize to the work site with all equipment necessary to construct the project improvements. <br />On the first and every day of field work, a minimum 10 -minute safety meeting will be conducted by work crews <br />to review, discuss, and sign a daily Job Hazard Analysis sheet. The following details outline the general project <br />construction: <br />The work site will be set-up for efficient execution of work tasks. <br />Direct mud -rotary drilling, drill fluid conditioning, and drill cuttings containment will be performed to: <br />a. Drill a 12.25 -inch -diameter pilot hole to a total depth of approximately 1,650 feet below the <br />ground surface. <br />b. Conduct geophysical logging to the total borehole depth including: natural gamma ray; <br />spontaneous potential; short -normal, long -normal, and lateral (point) electrical resistivity, and; <br />caliper logs. <br />c. Construct a dual -completion monitoring well in the pilot hole for the two deepest target zones. <br />d. Step -over at least 10 feet and drill a second boring to construct a quadruple -completion <br />monitoring well (e.g., four well casings in a single borehole) for the four additional targeted <br />zones. <br />All of the following tasks will be completed under the direction of a Professional Geologist: <br />a. Supervision of the drilling, well construction, and well development operations. <br />b. Examination of drill cuttings during drilling and creation of a lithologic log of the boring. <br />c. Review of the lithologic and geophysical logs alongside each other and selection of the final <br />well screen depth intervals according to hydrostratigraphic interpretation and concurrence with <br />the GSA. <br />d. Creation of a field as -built well construction diagram. <br />4. In general, well construction will involve: <br />a. Final reamed borehole diameters of: <br />i. 12.25 inches for the deep borehole <br />ii. 12.25 inches below 400 feet and 14 -inches above 400 feet for the shallow borehole <br />b. Based on preliminary design by the GSA with DWR input, well specifications are targeted to be: <br />i. 2.5 -inch diameter, Schedule 80 PVC blank casing. <br />ii. 2.5 -inch diameter, Schedule 80 PVC, 0.020 -inch -wide, mill -slotted well screens. <br />iii. Each water bearing zone is expected to have a screen interval approximately 40 -feet - <br />long. <br />c. A surface well seal of appropriate mixture and depth to meet well permit requirements will be <br />set. <br />d. Each well will be finished at the surface with a steel pipe with locking cover and concrete apron. <br />Security fencing will also be installed to protect the well from cattle. <br />Work crews will demobilize all equipment used to construct the project improvements, clean up all <br />work-related waste and unused materials, and return work areas to their original condition. <br />Well Development <br />Well development will occur no sooner than 32 hours after the well surface seal has been completed. Well <br />development will be accomplished by a combination of swabbing, surging, bailing to remove sediment, and <br />purging with a submersible or air lift pump. Well development will be performed until there is good hydraulic <br />connection between the formation and the well screen, or for a maximum of 4 hours if turbidity reduction is not <br />easily achieved. Termination of well development activities is at the discretion of the site Professional Geologist. <br />