Laserfiche WebLink
Figure Index <br />Figure 1 Site Location Map <br />Figure 2 Extended Site Plan <br />Figure 3 Site Plan with Proposed Monitoring Well Locations <br />Figure 4 1,2-DCA Concentration Map — A Zone, February 28, 2020 <br />Figure 5 Groundwater Elevation Contour Map — B Zone, February 28, 2020 <br />Figure 6 Groundwater Elevation Contour Mapr — C Zone, February 28, 2020 <br />Figure 7 TPH-G and Benzene Concentration Map — B Zone, February 28, 2020 <br />Figure 8 TPH-G and Benzene Concentration Map — C Zone, February 28, 2020 <br />Figure 9 MTBE Concentration Map — B Zone, February 28, 2020 <br />Figure 10 MTBE Concentration Map — C Zone, February 28, 2020 <br />Figure 11 1,2-DCA Concentration Map — B Zone, February 28, 2020 <br />Figure 12 1,2-DCA Concentration Map — C Zone, February 28, 2020 <br />Table Index <br />Table 1 Historical Groundwater Gauging and Analytical Results <br />Attachment Index <br />Attachment A CVRWQCB Correspondence <br />Attachment B Site History <br />GHD I Well Installation Work Plan Addendum 111193145 (5)1 Page iii