Laserfiche WebLink
destroyed approximately 59 pounds of TPHg. Oxygen injections were performed in the A, B, and B' <br />Zones. <br />A Zone Historical Data Review <br />GHD reviewed historical and current groundwater analytical data to determine if continued <br />groundwater monitoring and sampling of A Zone wells is still appropriate. Based on analytical data <br />from the most recent semi-annual groundwater monitoring and sampling event conducted during <br />the first quarter 2020, two of the five A Zone wells contained 1,2-DCA concentrations above the <br />water quality objective (WQ0). Based on current 1,2-DCA concentrations, monitoring of A Zone <br />wells will continue to further evaluate 1,2-DCA concentration trends and to define the extent of 1,2- <br />DCA in the A Zone. Destruction of A Zone wells is not proposed at this time. Figure 4 shows <br />current dissolved 1,2-DCA concentrations in the A Zone. <br />1,2-DCA Groundwater Analytical Data <br />During the May 13, 2020 meeting between GHD and CVRWQCB, CVRWQCB staff notified GHD of <br />1,2-DCA groundwater analytical data that is present in GeoTracker but not included in GHD's <br />historical groundwater analytical data table. GHD conducted a file review of all groundwater <br />monitoring and sampling reports available in GeoTracker and incorporated the 1,2-DCA analytical <br />data into the historical data table. The updated historical groundwater analytical data are <br />presented in Table 1 and will be included in future semi-annual groundwater reports. <br />Proposed Scope of Work <br />As discussed during the May 13, 2020 meeting, GHD proposes to install three offsite groundwater <br />monitoring wells to provide additional definition of dissolved petroleum hydrocarbon plumes in the B <br />Zone and C Zone. Total petroleum hydrocarbons as gasoline (TPHg) and 1,2-DCA concentrations <br />exceeding WQ0s extend offsite to the north and northeast. Proposed well MW-23 will be installed <br />to the northeast of the site in the City of Stockton's right-of-way, Sperry Avenue, to define the extent <br />of 1,2-DCA in the B Zone. Proposed wells MW-25 and MW-26 will be co-located to the north of the <br />site and installed in the C Zone and B Zone, respectively, to define the offsite extent of TPHg and <br />1,2-DCA. The locations of the proposed monitoring wells are shown on Figures 2 and 3. <br />Groundwater elevation and hydrocarbon isoconcentration contours in the B Zone and C Zone from <br />the most recent groundwater monitoring and sampling event conducting during the first quarter 2020 <br />are presented on Figures 5 through 12. <br />Given the proximity of the site to potential offsite residential receptors, the extent of hydrocarbon <br />concentrations exceeding WQ0s, and the known presence of water supply well "Well 10", GHD <br />proposes to conduct additional work to identify other known water supply wells in the vicinity of the <br />site and to confirm that nearby residences are on a water service. Further details of the proposed <br />assessment and well survey work are discussed below. <br />GHD I Well Installation Work Plan Addendum 111193145 (5) I Page 3