My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 9:09:16 AM
Creation date
4/13/2021 3:23:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540300
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409 TOSCO/UNOCAL #05643
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1502 N EL DORADO ST STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bona <br /> 2,090 µg/L, and 8,590 µg/L, respectively. Further information is available in IT Corporation's <br /> July 29, 1999, Underground Storage Tank Removal and Over-excavation Report. <br /> October 2009 Pilot Sparge Test by Stantec Consulting Corporation <br /> On October 6, 2009, Stantec injected approximately 26.8 pounds of oxygen into each remediation well <br /> and recorded depth to water, induced vacuum, and vapor concentration measurements in other site wells <br /> to determine an approximate radius of influence associated with the injections. The pilot sparge test <br /> demonstrated strong lateral and vertical communication between the B and B'Zones when injecting into <br /> the B Zone. Further information of well installations and the pilot sparge test are available in Stantec's <br /> November 10, 2009, Remedial Well Installation and Sparge Test Report. <br /> March 2010 through June 2012 Oxygen Sparging Events by Stantec <br /> From March 2010 through June 2012, Stantec conducted bi-weekly oxygen injection events in wells OS- <br /> 23 through OS-28. Approximately 13.4 pounds of oxygen was injected into each well and dissolved <br /> oxygen, depth to water, induced pressure, and vapor concentration measurements were recorded. At the <br /> completion of bi-weekly injection events, approximately 59 pounds of TPHg had been destroyed. Further <br /> information of site activities is available in Stantec's Semi-annual Summary Reports. <br /> GHD I Well Installation Work Plan Addendum I Attachment B 111193145(05)1 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.