My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 9:09:16 AM
Creation date
4/13/2021 3:23:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540300
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409 TOSCO/UNOCAL #05643
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1502 N EL DORADO ST STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
����Vater-Bearing Zone Current Schedule Proposed Schedule <br /> ����[-Zone Semi-Annual Annual, 1st Quarter <br /> ����[-Zone Semi-Annual Annual, 1It Quarter <br /> ����[-Zone Semi-Annual No Change <br /> ����F-Zone Semi-Annual No Change <br /> B'-Zone Semi-Annual Annual, 1It Quarter <br /> • B'-Zone Semi-Annual Annual, 1st Quarter <br /> B'-Zone Semi-Annual Annual, 1st Quarter <br /> B'-Zone Semi-Annual Annual, 1st Quarter <br /> ����F-Zone Semi-Annual Annual, 1It Quarter <br /> B'-Zone Semi-Annual Annual, 1st Quarter <br /> GHD proposes changing the GWM&S schedules for all A-zone and B'-Zone wells from semi-annual to annual in <br /> the first quarter of each year, with the exception of A-zone wells MW-3 and MW-4. <br /> 4. Domestic Well 10 <br /> Domestic Well 10 is a domestic supply well located on North Hunter St., approximately 1,200 feet from the center <br /> of the site property. GHD successfully contacted Mr. Mark Schafer, the property owner of record for 1821 N Hunter <br /> Street, Stockton, California, via telephone on October 3, 2022 at approximately 12:45pm. Mr. Schafer indicated <br /> that the dwelling on the property is not connected to water provided by Cal Water, and that the dwelling receives <br /> all water from Domestic Well 10. Mr. Schafer told GHD that Well 10 is approximately 100 feet deep, but also said <br /> that he thought that the well might have been re-drilled deeper to approximately 180 feet. He indicated that the <br /> well construction information is physically located at the well or perhaps printed on it somewhere, but that he would <br /> not be able to get over to it for about a month or so. GHD followed up the telephone conversation via email on <br /> October 3, 2022 summarizing the well construction information that we would like to confirm about the well. GHD <br /> sent a follow up email on October 21, 2022 and a follow up phone call on November 11, 2022. No response to <br /> either email or a return phone call has been received as of the writing of this report. <br /> 5. Offsite Investigation <br /> GHD proposes to install three offsite groundwater monitoring wells to provide additional vertical and lateral plume <br /> delineation and further define the extent of dissolved petroleum hydrocarbons in the B- and C-zones. MTBE and <br /> 1,2-DCA concentrations exceeding Water Quality Objectives (WQOs)extend offsite to the north and northeast. <br /> The three new monitoring wells will consist of one (1) B-zone monitoring well and one (1) C-zone monitoring well <br /> co-located to the east-northeast of MW-23 on North Hunter Street, and one (1) C-zone sentry well located on East <br /> Alder Street to monitor groundwater between the plume boundary and Domestic Well 10. Proposed wells MW-27 <br /> and MW-28 will be installed to the northeast of the site in the City of Stockton's right-of-way on North Hunter <br /> Street, to define the extent of 1,2-DCA and MTBE in the B-zone and 1,2-DCA in the C-zone. Proposed well MW- <br /> 29 will be located to the north of the site and installed in the C-zone to define the offsite extent of TPHg and 1,2- <br /> DCA and act as a sentry well for Domestic Well 10. The locations of the proposed monitoring wells are shown on <br /> Figure 3. B-zone hydrocarbon isoconcentration contour maps and rose diagram from the second semi-annual <br /> GHD I Phillips 66 112594700 1 Offsite Investigation Work Plan 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.